Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 7, 2026

00 Filing Transmittal Letter 3354562

Preserved file SHA-256e71e367a4bd9354d281239c0e82fd12f8e5ffd7139234cd433ee350bad5650bd

Indexed text · page 2

Show all pages
Page 2

Township of West Orange Planning Board December 17, 2025 Page 2 3354562.1 100724-109634 7. Hudson-Essex-Passaic Soil Conservation District Certification, dated September 30, 2025; 8. New Jersey Department of Transportation Letter of No Interest, dated September 18, 2025; 9. Stormwater Management Report, prepared by Bohler Engineering, dated August 2025, revised December 2025; 10. Traffic Statement, prepared by Traffic Planning & Design, Inc. (TPD), dated September 19, 2025, revised December 12, 2025; 11. Site Traffic Control Plans prepared by TPD, dated December 10, 2025, consisting of the following sheets: a. Traffic Control Notes (Sheet 1 of 3); b. Traffic Control Plan – Stage 1 (Sheet 2 of 3); c. Traffic Control Plan – Stage 2 (Sheet 3 of 3); 12. Civil Engineering Plans prepared by Bohler Engineering, dated August 14, 2025, revised December 10, 2025, consisting of the following sheets: a. Cover Sheet (C-101); b. General Notes (C-102); c. General Legend (C-103); d. Existing Conditions/Demolition Plan (C-201); e. Site Plan (C-301); f. Truck Turning Plan WB-67 (Title 39) (C-302); g. Truck Turning Plan SU-30 (Garbage) h. Grading Plan (C-401); i. Drainage Plan (C-402); j. Utility Plan (C-501); k. Soil Erosion and Sediment Control Plan (C-801); l. Soil Erosion & Sediment Control Plan Notes & Details (C-802); m. Soil Erosion & Sediment Control Plan Notes & Details (C-803); n. Detail Sheet ‘A’ (C-901); o. Detail Sheet ‘B’ (C-902); p. Tree Removal Plan (L-101); q. Landscape Plan (L-201); r. Landscape Notes and Details (L-202); s. Lighting Plan (L-301); and t. Lighting Specifications and Details (L-302);

File revisions (1)