Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 15, 2026

26 01 09 CME Engineering Review 3

Preserved file SHA-256c117e77a4ff8121eed6506b796a543a984256c88f8bd5d0d612b3551a6610e35

Indexed text · page 3

Show all pages
Page 3

Chairman and Members of the West Orange Township Zoning Board January 9, 2026 Re: Pardo Development Group (ZB-24-17) Our File No. 115.WRZ0046.V01 Variance Application – Review #3 Page 3 B. DESIGN COMMENTS 1. Based on our review of the submitted documents, the following information remains to be submitted to the Board as stipulated on the Checklist of Required Items for “C” and “D” Applications, Interpretations, and Appeals: a) All plans and documents for West Orange COAH requirements. The Applicant has provided testimony indicating that this item will be provided as a condition of approval. 2. Sheet 3 of the Variance Plan should be revised to provide 6” of stormwater runoff storage for each square foot of increased impervious coverage in accordance with §25.29.9.a.1. The Applicant has provided testimony indicating that this plan revision will be addressed as a condition of approval. 3. The Applicant must obtain Soil Erosion and Sediment Control Plan Certification from the Hudson-Essex-Passaic Soil Conservation District prior to construction. The Applicant has provided testimony indicating that this permit will be provided as a condition of approval. 4. Retaining wall design plans and calculations, prepared by a structural engineer, must be provided. The Applicant has provided testimony indicating that this item will be provided as a condition of approval. The Applicant is hereby advised that any revised plans or other documents submitted to the Board should be accompanied by a cover letter which addresses each of the comments in this review letter and also details any other changes that have been made to the plans as these may not be readily apparent.

File revisions (1)