Supporting Documentation · Jan 28, 2026
O41 Resolution of Approval Verona PB Dated 9 25 80
3200c55c59bb66b38c3f054836a6da0da9411e6e4b1a24f84084c509d156c9a3Indexed text
Sept 24, IGE Resdotisy of Appeov Ad PTY TELS Wi w id uk We aw ait PLANNING BOARD . BOROUGH OF VERONA i - ~ Whereas the Planning Board of the Borough of Verofa,. having considared - the evidence and ‘testimony presented by the applicant, Sutton Construc- tion Compeny, for preliminary major oe approval for development or Ficnensy d known as Map 39, Block E, ok 50, Hap 39, Block F,-Lots 7 & 8. now, therefore, be it resolved by the Planning Board of the Borough of Verona that it hereby grants preliminary sEEroves subject to the follow- ing eenditionss 1. That it be in ‘accordance with the plans, exhibits and testimony pre-. sentad at this bearing. s That constedetdion on the property not begin until final approval is --obtained by both the Borough of Verona end the Town of Vest Orange and further that it not begin until a satisfactory solution ist [ reached by both: Municipalities as to ell ancillary services to. be provided. Construction must begin within nine months following the - last of all of the aforementioned events occuring. That it be “subject to the approval of the Essex County Planning Board. That it be subject to the approval, of the nuason-Beee-Pedeade S02 Conservation District. Pe That it be subject ‘to final approval by the Town of West Orange. That the applicant in cooperation with the appropriate Borough offic- als explore the possibility of having the water service connections with the Borough of Verona rather than the Commonwealth Water Company and that these water service connections infact be with the Borough if acceptable to it and further that the applicant comply with all re- quirements to accomplish the water connections including a pumping station if required. That it be subject to a.final official determination in favor of the applicant in the present litigation involving the ordinance prohibit- ing sewerage connections on property without the jurisdictional limits of the Borough of Verona. - That it be subject to the approval of the Borough Engineer. That a restrictive covenant be placed in the deed of each individual lot in the entire deyelopment against any use other than one family homes. . =
-10. That the drainage system to be subject Lo the approval of the Borough Engineer. ” 7 That any soil removal be in accordance with the soil removal ordinance of the Borough of Verona.. it. That the applicant subrit at the completion of work the "es built" Grewings. 123 13. That it be subject to complying with the tree removal ordianace. That eri escrow fund in.the emount of $6,000.00 be pleced with the Borough 14. of Verona to provide for mzintenance for lot 9 containing the detention basin, That fencing on lot 9 around the detention besin be provided if deter- mined by the Borovgh of Verona within a five year period and that the epplicant deposit with the Borough an escrow fund in the amount to be determined by the Borough Engineer. 15s That any change in the West Orange Portion of this tract with regerd to. lot arrangement, road layout, utility basements and storm drainage not ~ specifically approved by this Board will. void this approval. That a study as to the amount-of water flow be conducted by the appli- cant end submitted to the Board prior to final approval. 18. That | upon final approval a performance .bond be supplied in accordance with the bonding ordinance. - 19. That utality easéments will not be: paved over for roadways. Approved » ee oy) Lope” / eapy :- a Chet rma Approved by. & ft ani piews September 25, 1980
File revisions (1)
- Sep 29, 2026
3200c55c59bb1,293,777 bytes