-10. That the drainage system to be subject Lo the approval of the Borough Engineer. ” 7 That any soil removal be in accordance with the soil removal ordinance of the Borough of Verona.. it. That the applicant subrit at the completion of work the "es built" Grewings. 123 13. That it be subject to complying with the tree removal ordianace. That eri escrow fund in.the emount of $6,000.00 be pleced with the Borough 14. of Verona to provide for mzintenance for lot 9 containing the detention basin, That fencing on lot 9 around the detention besin be provided if deter- mined by the Borovgh of Verona within a five year period and that the epplicant deposit with the Borough an escrow fund in the amount to be determined by the Borough Engineer. 15s That any change in the West Orange Portion of this tract with regerd to. lot arrangement, road layout, utility basements and storm drainage not ~ specifically approved by this Board will. void this approval. That a study as to the amount-of water flow be conducted by the appli- cant end submitted to the Board prior to final approval. 18. That | upon final approval a performance .bond be supplied in accordance with the bonding ordinance. - 19. That utality easéments will not be: paved over for roadways. Approved » ee oy) Lope” / eapy :- a Chet rma Approved by. & ft ani piews September 25, 1980

File revisions (1)