Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 28, 2026

O42 Verona PB Resolution Approval Dated 7 28 83

Preserved file SHA-256ebdc94cd589493c0b0a89475ab37b26f2a7d2f21c5d5a6f141c69a689f30c6e3

Indexed text · page 3

Show all pages
Page 3

=3= 8. That an escrow fund be established with the Township Treasurer and that the developers submit $6,000 to provide for maintenance of Lot No. 9 - detention basins; 9. That an escrow fund be established with the Township Treasurer and that a sum approved by the Township Engineer, be submitted to the Township by the developers to provide fencing around the detention basins on Lot No. 9, within a five (5) year period, if determineg necessary by the Township of the Borough of Verona; 10. That an escrow fund be established with the 1: rer and that a sum approved by’ the Township Engineer be submitted to the Township by the developers to Pay for engineering inspection fees; forth hereinabove, be incorporated herei TIN, Acting Secretary Approved: July 28, 1983

File revisions (1)