7 - Gianfranco Sarrido, the architect, entered on the record; he was sworn under oath. His credentials were accepted by the board and he testified to the following: - Mr. Sarrido presented the proposed exterior building elevations plan, submitted on November 21st, 2025. - The building is pre-existing; it has a brick facade. - They are trying to match the finished canopy with the existing building. - They're closing all the windows on the side since it's a manufacturing facility, they don't need the windows, and they are in very bad shape. - The windows on the front of the building, facing Ashland, will remain, but it will be in film, so won't be able to see it through. - They are adding an exterior staircase for access to get to the HVAC equipment over the canopy. - Nobody would be able to get into that portion of the building except for security. - It will be fully closed at all times. - Normally, the board would see an application with HVAC equipment on the roof with screening. In this case, the equipment is going on a canopy at a lower level. - They are also trying to reduce the visual impact of that equipment, even though it's in the interior of the lot, and nobody can really see it. - There was some barbed wire on a fence, but they're removing that. - There is already an existing transformer, and they're adding a generator. They will be located in the interior of the site, some considerable distance from the residents. - The doors will be pressure controlled so no odor escapes the building. - In addition to the doors, other odor mitigation will include a MERV 15 filtration system with carbon filtration as well. - There is an acceptable path from the ADA space into the existing building. The entrance is at floor level. BOARD QUESTIONS - Councilperson Scarpa asked why the 8 feet fence was originally proposed, was it for security reasons. Mr. Sarrido said they got it down to 6 feet to match what they have existing on-site. - Councilperson Scarpa asked if 6 feet is okay from a security perspective. Mr. Sarrido said yes, they have electrified gates. - Ms. Apte asked how tall the HVAC units are. Mr. Sarrido said about 50 inches. - Ms. Apte asked why a 14-foot enclosure is proposed around the units. Mr. Sarrido said it is for aesthetic purposes to match the building exteriors. - Ms. Apte asked where the cannabis waste are going to be stored. Mr. Sarrido said

Page 7

nclosure is proposed around the units. Mr. Sarrido said it is for aesthetic purposes to match the building exteriors. - Ms. Apte asked where the cannabis waste are going to be stored. Mr. Sarrido said it will be stored in the delivery room. - Ms. Apte asked if the access is only for the employees and the cannabis waste handler, and if there would be a separation between manufactured products and the cannabis waste. Mr. Sarrido said yes to both. - Ms. Apte asked if the front of the building would be locked. Mr. Sarrido said it will be used as an emergency exit. - Mr. Savage asked how the water that's used in the cultivation is going to be handled and discharged. Mr. Sarrido said reverse osmosis is what they use to treat the water. *The Application has been carried to the next Planning Board regular meeting on January 7, 2026, without further notice* • PB-24-01 West Essex Highlands, Inc

File revisions (1)