Supporting Documentation · Feb 4, 2026
West Orange Fourth Round HEFSP_adopted 111025_Appendices
bb8ec7b235e39ac013717e0d4aeabdee293a925171ae3bdeed405adeac15eea9Indexed text · page 187
Show all pagesy. The Environmental Compliance Officer shall review the application and respond within ten (10) days of receipt of all required information. vi. WEHI may appeal a negative decision to the Township Council for reconsideration. d. Utilize energy efficient double pane, low-e glazing on windows and patio doors throughout the development with the following minimum performance standards: i. Windows will have a minimum National Fenestration Rating Council (NFRC) performance standard of: 1. U Factor </=,30 2. SHGC ->/=.40 a. Window selection may be modified based on the orientation of the residential units. Windows facing East/South and West must meet both criteria. Windows facing North may waive the SHGC standard but must meet the U factor standard. ii, Patio or glass doors of any type leading from residential units to balconies or patios will have minimum National Fenestration Rating Council (NFRC) performance standard of: 1. U Factor </=.30 2. SHGC - >/=.40 a, Door selection may be modified based on the orientation of the residential units. Windows facing East/South and West must meet both criteria. Windows facing North may waive the SHGC standard but must meet the U factor standard. e. Utilize Energy Star or DLC approved LED lighting throughout interior and exterior. For common area exterior site lighting, provide Dark Sky Qualified lighting and incorporate one or more of the following: i. Motion sensor controls ii. Integrative photovoltaic cells. iii. Photosensors iv. Astronomic time-clock operation Renewable energy: Design structures to allow for future incorporation of solar panels. Each lavatory faucet will have a maximum flow rate of 1.5 gallons per minute. Each toilet shall utilize no more than 1.28 gallons per flush. Each showerhead will have a maximum flow rate of 2.0 gallons per minute. Covered Parking Areas: Reduce tenant exposure to indoor pollutants from covered parking through the use of tightly sealed building envelope and natural or mechanical ventilation of enclosed parking areas per the building code standards. i. Ata minimum, all conditioned spaces above the garage shall have all penetrations and all connecting floor and ceiling joist bays sealed. ii. Electric Vehicle Charging Stations: Install electric vehicle charging stations at each building (within underground parking area) and make provisions for additional future
ling joist bays sealed. ii. Electric Vehicle Charging Stations: Install electric vehicle charging stations at each building (within underground parking area) and make provisions for additional future charging stations through installation of conduit. a oe pon
File revisions (1)
- Sep 29, 2026
bb8ec7b235e338,190,166 bytes