Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Feb 4, 2026

West Orange Fourth Round HEFSP_adopted 111025_Appendices

Preserved file SHA-256bb8ec7b235e39ac013717e0d4aeabdee293a925171ae3bdeed405adeac15eea9

Indexed text · page 347

Show all pages
Page 347

Township of West Orange 66 Main Street West Orange, NJ 07052 973-3254112 CERTIFICATE Block: 155 Lot: 42.02 __| Work Site Location: 3000 EXECUTIVE DRIVE WEST ORANGE Owner in Fee: WEST ORANGE OFFICE EXECUTIVE PARK Construction Classification: Address: 100 EXECUTIVE DRIVE Maximum Occupancy Load: WEST ORANGE NJ 07052 Telephone: 973 640-0973 Agent/Contractor: BUILDERS AT GREEN ESSEX Address: 16 MICROLAB ROAD LIVINGSTON NJ 07039 Telephone: 973 640-0973 Lic, No./ Bldrs. Reg.No.: Federal Emp. No.: [xX] CERTIFICATE OF OCCUPANCY This serves notice that said building or structure has been constructed in accordance with the New Jersey Uniform Construction Code and is approved for occupancy. ed CERTIFICATE OF APPROVAL, This serves notice that the work completed has been constructed or installed in accordance with the New Jersey Uniform Construction Code and is approved. If the permit was issued for minor is certificate was based upon what was visible at the time of inspection. TEMPORARY CERTIFICATE OF OCCUPANCY/COMPLIANCE lowing conditions must be is a temporary Certificate of Occupancy or Compliance, the f met no later than _ or will be subject to fine or order to vacate: i | 2fepey Thomas Biondi Jr Construction Official U.C.C 260 (rev. 5/03) 1-APPLICANT 2-OFFICE 3-TAX ASSESSOR Date Issued: 12/12/2024 Control #: 90737 Permit #: 20221436 IDENTIFICATION Home Warranty No: ‘Type of Warranty Plan: [J Use Group: R-2 Maximum Live Load: State[ ] Private Certificate Exp Date: Description of Work/Use: FOOTING & FOUNDATION FOR 62 UNIT APARTMETN BUILDING - 3000 EXECUTIVE DRIVE BLDG C UNDERGROUND PLUMBING Update Desc. of Wk/Use: CONSTRUCT 62 APARTMENT BUILDING- BLDG C, RADIO COMMUNICATOR ON FACP nig CERTIFICATE OF CLEARANCE-LEAD ABATEMENT 5:17 serves notice that based on written certification, lead abatement was performed as per NIAC 5:17, to the following extent: [ ] Total removal of lead-based paint hazards in scope of work [] Partial fed time period( years); see file [J CERTIFICATE OF CONTINUED OCCUPANCY This serves notice that based on a general/smoke/earbon detector inspection of the of the building there are no imminent hazards and the building is approved for co occupancy. [ ] CERTIFICATE OF COMPLIANCE nent has been installed and/or maintai n Code and is approved for use ui hazardous equi in accordance with the New Jersey Uniform

Page 347

uilding is approved for co occupancy. [ ] CERTIFICATE OF COMPLIANCE nent has been installed and/or maintai n Code and is approved for use ui hazardous equi in accordance with the New Jersey Uniform Constru Fees: $50.00 | X JCheck No.: 6063 Collected by: PQ

File revisions (1)