Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Feb 4, 2026

West Orange Fourth Round HEFSP_adopted 111025_Appendices

Preserved file SHA-256bb8ec7b235e39ac013717e0d4aeabdee293a925171ae3bdeed405adeac15eea9

Indexed text · page 437

Show all pages
Page 437

that the setbacks of the proposed Application are less deviant from the Township Zoning Ordinance requirements than the present structure of the Turtle Back Inn but still require variances, he discussed turning ratios in the parking lot for fire and garbage truck access; Mr. Lanzafama was re-called to testify about the new site plan presented by the Applicant during the course of the proceedings that turned the day care center building to face towards Northfield, and also relocated the playground to the rear of the building, and the re-design of the apartment building reduces the appearance of the mass of building, which resulted in a an additional parking space, and then reviewed the Township Engineer’s comments letters dated April 1, 219 and September 13, 2019 and testified the Applicant will comply with all requests in the Design Comments and Plat Details (Section C) in the September 13, 2019 report of John Hess of Certified Municipal Engineers “CME”, the Township Consulting Engineers, with the exception of number 7, which request was withdrawn by the Township Engineer Mr. Hess; and WHEREAS, the Applicant presented testimony of Mark Pavey, 136 Cove Avenue, Golf Shores Alabama, a licensed Professional Architect of the State of New J ersey, who was recognized by the Board as such, Mr. Pavey testified his practice is emphasized in the area of childcare structures and that he has designed several such structures for Primrose Schools and Kindercare, Mr. Pavey presented the architectural plans for the childcare center which will contain 12 classrooms, comply with all State requirements for childcare centers, the building will include a warming kitchen, that the building is designed for a maximum occupancy student population of 194 students, which would call for 22-24 employees, and 2 administrative staff and

File revisions (1)