Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 6, 2026

13026 Resubmission

Preserved file SHA-2560e7392dd7d594406a7ef76abd40438d954e383491ee5ec94505f00a12f9db01d

Indexed text · page 26

Show all pages
Page 26

AVE AVENUE CRCMF CIRCUMFERENCE FIN FL FINISH FLOOR JT JOINT OF OUTSIDE FACE SC SOLID CORE UR URINAL BUILDING, SEALANTS MUST BE RESILIENT AND NON-HARDENING. STANDARD WEATHER 9. ATTIC KNEEWALLS AND JOIST CAVITIES UNDER ATTIC KNEEWALLS. B&B BALLED AND BURLAPPED CRS COLD ROLLED STEEL FIN FINISH KB KNEE BRACE OFCI OWNER FURNISHED/ SCHED SCHEDULE UTIL UTILITY REALTY LLC CAULKING IS UNSATISFACTORY AS AN ACOUSTICAL SEALANT, SINCE IT TENDS TO HARDEN 10.TUB/SHOWER ENCLOSURE TO SUBFLOOR. OVER TIME. PLACEMENT OF THE SEALANT IS CRITICAL. THE PURPOSE OF THE SEAL IS TO BAF BAFFLE CSG CASING FL FLASHING KO KNOCKOUT CONTRACTOR INSTALLED SCMU SOLID CMU V VOLT 262-270 MAIN STREET 11.MASONRY FIREPLACE TO SUBFLOOR. BAL BALANCE CSK COUNTERSUNK FLG FLANGE OFF OFFICE SCRN SCREEN PROVIDE A RESILIENT CLOSURE BETWEEN ONE SIDE OF AN ASSEMBLY AND THE OTHER, 12.ELECTRICAL SERVICE PANEL ON EXTERIOR WALL OR TENANT SEPARATION WALLS. BB BULLETIN BOARD CSMT CASEMENT FLR FLOOR KOP KNOCKOUT PANEL

Page 26

KOP KNOCKOUT PANEL VAC VACUUM WEST ORANGE, NJ 07052 KPL KICK PLATE OFOI OWNER FURNISHED/ SD STORM DRAIN VAV VARIABLE AIR VOLUME WHICH REDUCES THE POTENTIAL FOR FLANKING NOISE TRANSMISSION. THE PREFERRED 13.HVAC DUCT JOINTS AND SEAMS SEALED WITH MASTIC. BC BACK OF CURB CSWK CASEWORK FLR SK FLOOR SINK KWY KEYWAY OWNER INSTALLED SECT SECTION VB VINYL BASE 646 427 9908 PROCEDURE IS TO INSTALL THE GYPSUM WALL BOARD WITH A MINIMUM 1/4" GAP BETWEEN 14.REGISTER BOOTS SEALED TO SUBFLOOR. BD BOARD CT CERAMIC TILE FLR PL FLOOR PLATE OPNG OPENING SGL SINGLE VCT VINYL COMPOSITION TILE L LEFT THE ADJACENT CEILING GYPSUM PANEL AND ALSO AT THE SUBFLOOR. SEALANT SHOULD 15.EXHAUST VENTILATION DUCT JOINTS AND SEAMS SEALED WITH MASTIC. BEV BEVEL CTV CABLE TELEVISION FLR FIN FLOOR FINISH LAB LABORATORY OPP OPPOSITE SHR SHOWER VERT VERTICAL BE

Page 26

SION FLR FIN FLOOR FINISH LAB LABORATORY OPP OPPOSITE SHR SHOWER VERT VERTICAL BE APPLIED TO FILL THE PERIMETER GAP BETWEEN THE GYPSUM WALL BOARD AND THE 16.WIRING PENETRATIONS THROUGH TOP AND BOTTOM PLATES OF STUD WALLS. BF BOTH FACES CUB CUBICLE FLT GL FLOAT GLASS OPT OPTIONAL SHTHG SHEATHING CONSULTANTS: LAV LAVATORY VEST VESTIBULE SURROUNDING FLOOR, WALL AND CEILING COMPONENTS. CAULKING SHOULD NOT BE BFF BELOW FINISH FLOOR CUR CURRENT PLACED BENEATH THE SILL PLATE OR RUNNER TRACK OF A WALL ASSEMBLY. 17.WIRING INTO ELECTRICAL BOXES. FLUOR FLUORESCENT LB POUND ORD OVERFLOW ROOF DRAIN SHVL SHELVES VIB VIBRATION TRAFFIC ENGINEER 18.PLUMBING PIPES AND VENTS THROUGH TOP AND BOTTOM PLATES OF STUD

Page 26

VIBRATION TRAFFIC ENGINEER 18.PLUMBING PIPES AND VENTS THROUGH TOP AND BOTTOM PLATES OF STUD WALLS. BFP BACKFLOW PREVENTER CW COLD WATER FOC FACE OF CONCRETE LBR LUMBER ORIG ORIGINAL SIM SIMILAR VNR VENEER 19.BATH AND SHOWER DRAINS TO SUBFLOOR. BITUM BITUMINOUS DBL GLZ DOUBLE GLAZING FOM FACE OF MASONRY LCMU LIGHTWEIGHT CMU OVHD OVERHEAD SJ SLIP JOINT VOL VOLUME DOLAN&DEAN G. INSULATION INDICATED TO BE PROVIDED IN A WALL ASSEMBLY SHALL BE THE SAME DEPTH BJT BED JOINT DEPT DEPARTMENT FOS FACE OF STUD LD BRG LOAD BEARING OXY OXYGEN SK SINK VR VAPOR RETARDER CONSULTING ENGINEERS, LLC AS THE WALL STUD FRAMING. UNLESS OTHERWISE REQUIRED BY CODE, REGULAR UN- AIR SEAL THE FOLLOWING LOCATIONS AFTER GYPSUM WALL BOARD INSTALLATION: BL BASE LINE DET DETAIL FPL FIREPLACE LDG LANDING P PAINT SLP SLOPE VT VINYL TILE 181 WEST HIGH STREET FACED GLASS FIBER OR MINERAL WOOL INSULATION IS ACCEPTABLE. DO NOT OVERSTUFF 1. PROVIDE 1/4" SEALANT AT GWB

Page 26

SLOPE VT VINYL TILE 181 WEST HIGH STREET FACED GLASS FIBER OR MINERAL WOOL INSULATION IS ACCEPTABLE. DO NOT OVERSTUFF 1. PROVIDE 1/4" SEALANT AT GWB TO SUBFLOOR AT EXTERIOR WALLS AND TENANT BLDG BUILDING DF DRINKING FOUNTAIN FPRF FIREPROOFING LF LINEAR FOOT PAR PARALLEL SLV SLEEVE VWC VINYL WALL COVERING THE INSULATION, AS THIS WILL REDUCE THE ACOUSTICAL PERFORMANCE OF THE SEPARATION WALLS. BLK BLOCK DFR DOOR FRAME FRM FRAME LG LENGTH PARG PARGING SM SHEET METAL W/ WITH SOMERVILLE, NJ 08876 ASSEMBLY. 2. DOOR FRAMES TO GWB AT EXTERIOR WALLS AND CORRIDOR WALLS. BLKG BLOCKING DH DOUBLE HUNG FRNT FRONT LH LEFT HAND PB PANIC BAR SMLS SEAMLESS W/W WALL TO WALL 908 927 0100 3. WINDOW FRAMES TO GWB AT EXTERIOR WALLS. BLKHD BULKHEAD DIM DIMENSION FS FINISHED SURFACE LHR LEFT HAND REVERSE PBD PARTICLEBOARD SP SPACING W/O WITHOUT H. RESILIENT METAL COMPONENTS - RESILIENT CHANNELS SHALL BE DIETRICH RC DELUXE

Page 26

CLEBOARD SP SPACING W/O WITHOUT H. RESILIENT METAL COMPONENTS - RESILIENT CHANNELS SHALL BE DIETRICH RC DELUXE BLST BALLAST DIST DISTANCE FSP FIRE STANDPIPE LIN LINEAR PC PORTLAND CEMENT SPCL SPECIAL W/R WATER RESISTANT STRUCTURAL ENGINEER 4. TUB/SHOWER ENCLOSURE TO GWB. RCSD. RESILIENT CHANNELS POSSESS A SPRING ACTION TO DECOUPLE AND ISOLATE THE 5. ATTIC AND CRAWLSPACE ACCESS COVERS TO GWB OR SUBFLOOR. BM BEAM DIV DIVIDER FSTNR FASTENER LIQ LIQUID PCP PORTLAND CEMENT SPEC SPECIFICATION W WEST HUDSON ENGINEERING, LLC. COMPONENTS THEY CONNECT, WHILE PROVIDING THE STRENGTH TO FIRMLY SUPPORT BP BASE PLATE DIW DEIONIZED WATER FTG FOOTING LKR LOCKER PED PEDESTAL SPKLR SPRINKLER WC WATER CLOSET 25 W8TH STREET, BSMT 6. ATTIC ACCESS PULL-DOWN STAIRS SEALED WITH WEATHERSTRIPPING ON COVER. THESE COMPONENTS. A CONCERN IN THE INSTALLATION OF GYPSUM BOARD ON RESILIENT BRCG BRACING DJ DOUBLE JOIST FURR FURRING LKR RM LOCKER ROOM PERF PERFORATED SPKR SPEAKER WD WOOD 7. RECESSED LIGHT HOUSING TO GWB.

Page 26

7. RECESSED LIGHT HOUSING TO GWB. BRDG JST BRIDGING JOIST DL DEAD LOAD FUT FUTURE LL LIVE LOAD PERIM PERIMETER SPRT SUPPORT WDW WINDOW BAYONNE, NJ 07002 CHANNELS IS THE LENGTH OF THE FASTENER AND THE PLACEMENT OF THE FASTENER. 8. RECESSED WALL HEATERS (PTACS) SEALED TO GWB. THE FASTENER SHOULD NOT EXTEND INTO THE STUD OR JOIST, THUS SHORTING OUT THE 9. HVAC GRILLE AND DIFFUSER TO GWB. BRDG BRIDGING DMPF DAMPPROOFING FXTR FIXTURE LNTL LINTEL PERM PERMANENT SQ FT SQUARE FOOT WF WIDE FLANGE 201 614 5304 BRG BEARING DN DOWN GALV GALVANIZED LOC LOCATION PERP PERPENDICULAR SQ SQUARE WGL WIRE GLASS RESILIENCY OF THE SYSTEM. AN EFFECTIVE INSTALLATION TECHNIQUE IS TO PLACE 10.VENTILATION GRILLES AND INLETS TO GWB. BRG PL BEARING PLATE DO DITTO GB GRAB BAR PGBD PEGBOARD SQ IN SQUARE INCH SCREWS ONLY BETWEEN STUDS OR JOISTS. THE CHANNEL MUST ALSO BE FREE TO FLOAT 11.PLUMBING PIPE PENETRATIONS THROUGH GWB. BRK BRICK DR DRAIN

Page 26

IONS THROUGH GWB. BRK BRICK DR DRAIN LONG LONGITUDINAL WH WALL HUNG CIVIL ENGINEER GC GENERAL CONTRACTOR LRG LARGE PH PHASE SQ YD SQUARE YARD WHSE WAREHOUSE UPON INSTALLATION AND THUS A MINIMUM 1/4" INCH CLEARANCE BETWEEN IT AND THE 12.SHOWER HEAD TO TILE OR SHOWER SURROUND. BRKT BRACKET DRCLSR DOOR CLOSER GDRL GUARD RAIL LS LUMP SUM PL PLATE SSK SERVICE SINK WL WIND LOAD HUDSON ENGINEERING, LLC. ADJACENT ASSEMBLY IS REQUIRED. THE RESILIENT CHANNEL SHALL BE INSTALLED PER 13.CLOTHES WASHER VALVE/DRAIN BOX TO GWB. THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. BRS BRASS DS DOWNSPOUT GENL GENERAL LT LIGHT PLAM PLASTIC LAMINATE SS STAINLESS STEEL WLD WELDED 25 W8TH STREET, BSMT 14.CLOTHES DRYER EXHAUST BOX SEALED TO GWB. BRZ BRONZE DST DOOR STOP GFI GROUND FAULT INTERRUPTER

Page 26

14.CLOTHES DRYER EXHAUST BOX SEALED TO GWB. BRZ BRONZE DST DOOR STOP GFI GROUND FAULT INTERRUPTER PLAS PLASTER ST STREET WS WEATHERSTRIPPING 15.BUILT-IN CABINETS TO GWB. BS BOTH SIDES DT DRAIN TILE LT WT LIGHTWEIGHT BAYONNE, NJ 07002 GL BLK GLASS BLOCK LTG LIGHTING PLAT PLATFORM STAG STAGGERED WSCT WAINSCOT I. PIPES AND ELECTRICAL CONDUITS SHALL BE CONCENTRICALLY PLACED WITHIN WALL AND 16.STAIRWAYS IN CONTACT WITH EXTERIOR WALL SHALL BE SEALED AT GWB. BSMT BASEMENT DUPL DUPLICATE GL GLASS LVL LEVEL PLBG PLUMBING STD STANDARD WT WEIGHT 201 614 5304 FLOOR/CEILING ASSEMBLIES, UNLESS OTHERWISE REQUIRED PER FIRE AND OTHER 17.FIREPLACE BOX TO GWB. BTM BOTTOM DVTL DOVETAIL GLU LAM GLUE LAMINATED PLYWD PLYWOOD STIR STIRRUP

Page 26

ED PLYWD PLYWOOD STIR STIRRUP LVR LOUVER WTR WATER BUILDING CODES. 18.COMBUSTION AIR SUPPLY DUCTS AND PIPES TO GWB. BUR BUILT-UP ROOF DW DISHWASHER GLZ GLAZING LW PLAS LIGHTWEIGHT PLASTER POL POLISHED STL JST STEEL JOIST WTRPRF WATERPROOFING 19.METAL FLUES TO GWB. BW BOTH WAYS DWL DOWEL GLZ CMU GLAZED CMU LWC LIGHTWEIGHT CONCRETE POLY POLYSTYRENE STL PL STEEL PLATE WWM WELDED WIRE MESH J. REFER TO OTHER DRAWINGS, DETAILS AND SPECIFICATIONS FOR ADDITIONAL 20.KITCHEN AND BATH EXHAUST FAN HOUSING TO GWB. C/C CENTER TO CENTER DWR DRAWER GND GROUND M METER POLYISO POLYISOCYANURATE STL STEEL X SECT CROSS SECTION INFORMATION PERTAINING TO WALL AND FLOOR/CEILING ASSEMBLIES. 21.ELECTRICAL BOXES TO GWB. C&G CURB AND GUTTER DWTR DUMBWAITER GR BM GRADE BEAM MAINT MAINTENANCE POS POSITIVE STOR STORAGE VWC VINYL WALL COVERING 22.CABLE/PHONE BOXES TO GWB.

File revisions (1)