Show all pagesDRIVEN DEEP FOUNDATIONS IBC 1705.7 HUDSON ENGINEERING, LLC. 1/4" RUN THRU FROM FLOORS TO WALL AND FROM WALL TO WALL. K. MANUFACTURER'S INSTRUCTIONS: PROVIDE FOR EACH ITEM OF EQUIPMENT OR APPARATUS CAST-IN-PLACE DEEP FOUNDATIONS IBC 1705.8 A. ALL TILE SHALL BE SET IN ACCORDANCE WITH THE TILE COUNCIL OF AMERICA STANDARDS AND FURNISHED A COMPLETE SET OF PRINTED INSTRUCTIONS OBTAINED FROM THE MANUFACTURER 25 W8TH STREET, BSMT PART 7-THERMAL AND MOISTURE PROTECTION WITH AN EPOXY ADHESIVE EXCEPT AT EXTERIOR AND WET APPLICATIONS WHERE TILE SHALL BE COVERING OPERATION, CARE, LUBRICATION, CLEANING SERVICING, ADJUSTING, ETC., OF ITEMS HELICAL PILE FOUNDATIONS IBC 1705.9 DRY SET MORTAR. INVOLVED TOGETHER WITH SPECIAL SAFETY INSTRUCTIONS, PARTICULARLY INSTRUCT OWNER'S STRUCTURAL INTEGRITY OF DEEP FOUNDATION ELEMENTS IBC 1705.10 BAYONNE, NJ 07002 A. GENERAL B. GROUT SHALL BE PORTLAND
BAYONNE, NJ 07002 A. GENERAL B. GROUT SHALL BE PORTLAND CEMENT COMMERCIAL GRADE, COLOR SHALL BE WHITE AT ALL REPRESENTATIVE WHO WILL OPERATE PLANT IN ALL SUCH DETAILS. FABRICATED ITEMS IBC 1705.11 201 614 5304 1. SEE GENERAL CONDITIONS FLOORS AND WALLS. SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE IBC 1705.13 2. SEE PART IV - MASONRY 5. PAINTING SHALL BE DONE BY THOSE SKILLED IN THEIR TRADE. APPLY ALL MATERIAL EVENLY. NO L. MANUFACTURER'S DIRECTIONS: THESE SHALL BE FOLLOWED IN ALL CASES WHERE MANUFACTURER TESTING FOR SEISMIC RESISTANCE IBC 1705.14 CIVIL ENGINEER SAGS, RUNS, CRAWLS, OR OTHER DEFECTS SHALL BE ALLOWED. FURNISHES DIRECTIONS COVERING POINTS
SAGS, RUNS, CRAWLS, OR OTHER DEFECTS SHALL BE ALLOWED. FURNISHES DIRECTIONS COVERING POINTS NOT SHOWN IN DRAWINGS AND SPECIFICATIONS. HUDSON ENGINEERING, LLC. B. MATERIALS A. ALL SURFACES TO BE PAINTED SHALL BE THOROUGHLY AND UNIFORMLY COVERED, APPLY SPRAYED FIRE-RESISTANT MATERIALS IBC 1705.15 1. ASPHALTIC BITUMINOUS TROWEL ON DAMPPROOFING FOR FOUNDATIONS AND BELOW GRADE NECESSARY COATS TO COMPLETE JOB. M. OPERATING, MAINTENANCE AND INSTRUCTION DATA: SUBMITTED TO THE OWNER FOR APPROVAL MASTIC AND INTUMESCENT FIR-RESISTANT COATINGS IBC 1705.16 25 W8TH STREET, BSMT MASONRY WALLS. PRIOR TO ACCEPTANCE OF INSTALLATION, COMPLETE AND AT ONE TIME. EXTERIOR INSULATION AND FINISH SYSTEM IBC 1705.17 BAYONNE, NJ 07002 2. CAULKING AND SEALANTS SHALL BE SELECTED BY THE CONTRACTOR TO SUIT CONDITIONS AND D. PROTECTION AND CLEANING WATER RESISTIVE BARRIER COATING IBC 1705.17.1 201 614 5304 MATERIALS. 1. ALL WORK SHALL BE PROTECTED BY A TEAR RESISTANT HEAVY WEIGHT KRAFT PAPER, TAPE ALL N. GUARANTEES: ALL WORK COMPLETED GUARANTEED FOR A MINIMUM OF ONE YEAR EXCEPT FOR EXTENDED PERIOD FOR COMPRESSORS, ETC.
EXTENDED PERIOD FOR COMPRESSORS, ETC. FIRE-RESISTANT PENETRATION & JOINTS IBC 1705.18 A. CAULKING AND SEALANTS TO MATCH SURROUNDING SURFACE COLORS. SEAMS. PAPER SHALL BE INSTALLED IN AREAS SUBJECT TO TRAFFIC WHICH WOULD BE DETRIMENTAL B. ALL MATERIALS SHALL BE CAREFULLY SELECTED FOR COMPATIBILITY WITH EACH OTHER IN TO THE FINISHED SURFACE. ALL COVERINGS SHALL REMAIN IN PLACE FOR THE DURATION UNTIL THE PENETRATION FIRESTOPS IBC 1705.18.1 EACH JOINT SYSTEM. BUILDING IS READY FOR OCCUPANCY. FIRE-RESISTANT JOINT SYSTEM IBC 1705.18.2 C. ALL MATERIALS SHALL BE INSTALLED AS PER THE MANUFACTURERS WRITTEN INSTRUCTIONS. 2. EACH TRADE SHALL THOROUGHLY CLEAN AND MAKE GOOD ALL WORK IN THEIR CONTRACT. TESTING FOR SMOKE CONTROL IBC 1705.19 3. INSULATION SHALL BE INSTALLED IN THE TYPES AND SHAPES AS SHOWN ON THE DRAWINGS AND REMOVE ALL TRACES OF GROUT, DIRT, GREASE, ETC. TO THE SATISFACTION OF THE OWNER. SEALING OF MASS TIMBER IBC 1705.20 AS FOLLOWS: A. FIBERGLASS ROLLS OR BATTS FACED WITH ALUMINUM FOIL VAPOR RESISTANT MEMBRANE E. GUARANTEES WITH INTEGRAL NAILING FLANGES. 1. MANUFACTURERS AND CONTRACTORS SHALL GUARANTEE ALL WORK FOR A PERIOD OF 2 YEARS
OF 2 YEARS ARCHITECT'S SEAL: I. EXTERIOR WALLS: 3 1/2", R-13 MIN. WHERE SHOWN OR NOTED ONLY. FROM DATE OF FINAL ACCEPTANCE. ALL WORKMANSHIP AND MATERIALS SHALL BE FREE FROM II. PROVIDE UNFACED BATTS AT INTERIOR PARTITION WALLS AND CEILINGS IN THE SIZES AS DEFECTS. ALL REPAIRS SHALL BE PROMPTLY MADE. SHOWN ON THE DRAWINGS WHERE SHOWN OR REQUIRED FOR SOUND ABSORPTION 2. CONTRACTORS SHALL PROVIDE OWNER WITH SURPLUS STOCK OF ALL FINISH PRODUCTS. REQUIREMENTS. 3. IN THE EVENT ANY ADJACENT AREAS DAMAGED AS THE RESULT OF THE FAILED PRODUCT THE III. ROOFS AND CEILINGS UNDER UNHEATED SPACES: 9", R-30 DAMAGED WORK SHALL BE REPAIRED AT NO COST TO THE OWNER. INCLUDED ALSO SHALL BE B. RIGID INSULATION SHALL BE INSTALLED IN THE SIZES AS SHOWN ON THE DRAWINGS, SHALL BE ADJACENT AREAS WHICH MUST BE DISTURBED IN ORDER TO REPAIR DEFECTIVE MATERIALS. EXTRUDED AND HAVE AN "R" VALUE OF 5 PER INCH. I. INSULATION SHALL BE "STYROFOAM" BRAND AS MANUFACTURED BY THE DOW CHEMICAL CO. OR EQUAL. PART 10 - SPECIALTIES (NOT USED) 4. PROVIDE A TOTAL ROOF DRAINAGE SYSTEM AS SHOWN OR REQUIRED, INCLUDING, BUT NOT LIMITED TO GUTTERS, LEADERS, CHIPS, CLEATS, CAPS, ROOF DRAINS, ETC. A. PREFINISHED COLOR AS SELECTED, ALL MATERIALS SHALL MATCH. B. 0.04" ALUMINUM GUTTER, PROFILE AND SIZES AS SHOWN ON DRAWINGS. (EXPANSION JOINTS AS REQUIRED TO PREVENT BUCKLING) C. 0.04" ALUMINUM DOWNSPOUT, PROFILE AND SIZES AS REQUIRED, TIE TO UNDERGROUND DRAINAGE SYSTEM. PROGRESS DATE: 29-01-2026 D. ALUMINUM
PROGRESS DATE: 29-01-2026 D. ALUMINUM HANGERS FOR GUTTER AND STRAPS FOR DOWN SPOUTS, SIZES AS REQUIRED FOR JOB APPLICATION. JM E. ALL ACCESSORIES, MITERS, SLIP JOINTS, CONNECTIONS, END CAPS, ELBOWS, EXPANSION PRINCIPAL IN CHARGE JOINTS, ETC. F. 0.20" FLASHING AND COUNTER FLASHING. CC PROJECT TEAM G. SEALING OF ALL JOINTS AS PER MANUFACTURER'S RECOMMENDATIONS. 5. FLASHINGS SHALL BE INSTALLED WHERE NOTED OR REQUIRED. JM A. ALL FLASHINGS AND ACCESSORIES SHALL BE OF CORROSIVE RESISTANT MATERIALS.
JM A. ALL FLASHINGS AND ACCESSORIES SHALL BE OF CORROSIVE RESISTANT MATERIALS. CHECKED BY B. ALL MATERIALS SHALL BE FULLY COMPATIBLE WITH ONE ANOTHER AND ADJOINING MATERIALS. SHEET DESCRIPTION C. DISSIMILAR MATERIALS - ALUMINUM SHALL NOT BE CONCRETE, STUCCO MASONRY OR GENERAL NOTES CORROSIVE NONMETALLIC MATERIALS WHICH MIGHT BECOME REPEATEDLY WET. WOOD TREATED WITH SOME CHEMICALS CAN CAUSE PROBLEMS WHEN WET, SO USE ONLY TREATMENTS SUCH AS CREOSOTE, ZINC NAPHTHANATE PENTACHOLOROPHENAL (5% CONCENTRATION) OR WOLMAN SALTS. DO NOT PERMIT WATER FROM COPPER FLASHING TO DRAIN OVER ALUMINUM ISSUED FOR: PRODUCTS. No. Date Description 6. ROOFING SHALL BE INSTALLED IN THE LOCATIONS AS SHOWN ON THE DRAWINGS AND SHALL BE AS FOLLOWS: I.
No. Date Description 6. ROOFING SHALL BE INSTALLED IN THE LOCATIONS AS SHOWN ON THE DRAWINGS AND SHALL BE AS FOLLOWS: I. MODIFIED BITUMEN ROOF SEE MANUFACTURER'S RECOMMENDATIONS II. 15# ASPHALT SATURATED FELT UNDERLAYMENT. III. ALL ROOFING MATERIALS SHALL BE MANUFACTURED AND SUPPLIED BY A SINGLE ROOFING MANUFACTURER: CERTAINTEED, GEORGIA-PACIFIC OR APPROVED EQUAL. VII. COLOR BY ARCHITECT / OWNER. C. SOLID WOOD SIDING HORIZONTAL SIDING PANELS SHALL HAVE 4" NOMINAL EXPOSURE WITH DOUBLE BEVEL. A0.01D 1. SIDING TO HAVE FINISH AS SPECIFIED BY ARCHITECT/OWNER 2. WORKMANSHIP AND INSTALLATION I. BEFORE STARTING WORK, VERIFY GOVERNING DIMENSIONS OF BUILDING EXAMINE, CLEAN, REPAIR IF NECESSARY, ANY ADJOINING WORK ON WHICH THIS WORK IS IN ANY WAY DEPENDENT FOR ITSPROPER INSTALLATION. II. ALL WORK SHALL BE INSTALLED IN A COMPLETE PROFESSIONAL, WORKMANLIKE FASHION BY THOSE SKILLED IN THEIR TRADES AND IN STRICT ACCORDANCE WITH MANUFACTURERS WRITTEN SHEET NUMBER INSTRUCTIONS. III. COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, AND SAFE WORK PRACTICES. IV. ALL WORK EXPOSED TO VIEW SHALL BE INSTALLED TRUE TO LINE, AT PROPER ELEVATIONS, AND IN ALIGNMENT WITH OTHER WORK. V. INSTALL WOOD SIDING IN ACCORDANCE APPLICABLE CODES DOB APPROVAL STAMP: VI. UPON
DOB APPROVAL STAMP: VI. UPON COMPLETION OF THIS WORK, ALL SIDING, ETC. SHALL BE CLEANED SO THAT NO SOILED AREAS, FINGERPRINTS, ETC. ARE VISIBLE TO THE NAKED EYE. ALL SCRAP SHALL BE REMOVED AND PROPERLY DISCARDED. D. GUARANTEES 1. MATERIALS: THE CONTRACTOR SHALL FURNISH TO THE OWNER A 15 YEAR WRITTEN GUARANTEE ON ALL MATERIALS FURNISHED BY THOSE TRADES AS LISTED IN THIS SECTION TO BE FREE FROM DEFECTS DUE TO FAULTY WORKMANSHIP AND / OR MATERIALS. ALL DEFECTIVE MATERIAL SHALL BE REPLACED AS REQUIRED IMMEDIATELY AFTER PROPER NOTICE, AT NO COST TO THE OWNER. 2. THE CONTRACTOR SHALL GUARANTEE ALL ROOFING, WATERPROOFING, FLASHINGS, ETC. TO BE FREE FROM LEAKS FOR A PERIOD OF NOT LESS THAN 20 YEARS FROM DATE OF FINAL ACCEPTANCE. PART 8 - OPENINGS (SEE WINDOW / DOOR SCHEDULES) COPYRIGHT © JORGE MASTROPIETRO ATELIER ARCHITECTS