Supporting Documentation · May 6, 2026
13026 Resubmission
0e7392dd7d594406a7ef76abd40438d954e383491ee5ec94505f00a12f9db01dIndexed text
GLEN AVE R-M 262-270 MAIN ST SITE
262-270 MAIN ST SITE REDEVLOPMENT EXISTING SITE SURVEY E DG EHIL B-2 03
C1.01 SCALE: 1"=20' JORGE MASTROPIETRO ARCHITECTS
COVER SHEET L RD GENERAL NOTES:
SITE CIVIL DESIGN R-T R-T 1. THE FOLLOWING NOTES APPLY TO ALL SHEETS OF THESE DOCUMENTS.
R =1 0' 2. CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITIES, SCHEDULE, WORKING HOURS,
2. CONTRACTOR SHALL COORDINATE CONSTRUCTION ACTIVITIES, SCHEDULE, WORKING HOURS, AND ACCESS TO SITE WITH PROPERTY OWNER. 00 00 =1 0'
0' ESSEX R
3. THE CONTRACTOR SHALL COORDINATE ANY STORAGE ON SITE WITH THE PROPERTY OWNER. THE CONTRACTOR SHALL DISPOSE OF ANY PAVEMENT/SUBGRADE REMOVED FOR CONSTRUCTION, AT NO ADDITIONAL COST TO THE OWNER. I 4. CONTRACTOR SHALL COMPLY WITH LOCAL CONSTRUCTION STORMWATER DISCHARGE REGULATIONS AND REQUIREMENTS. B-1
B-1 5. PRIOR TO EXCAVATION FOR NEW STRUCTURES, ELECTRICAL CONDUIT, FABRICATION OF NEW PIPING AND/OR OTHER PROPOSED UTILITIES, VERIFY ALL EXISTING PIPING AND UTILITIES IN THE WORK AREA. THE CONTRACTOR SHALL TEMPORARILY RELOCATE CONFLICTING EXISTING UTILITIES AT TIE-IN CONNECTION LOCATIONS AND REINSTALL AS REQUIRED TO ELIMINATE THE CONFLICT AT NO ADDITIONAL COST
File revisions (1)
- Sep 29, 2026
0e7392dd7d5956,556,372 bytes