Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 6, 2026

PB 25 12 Application

Preserved file SHA-25699718697e29a016b4d2d11e4f87eeea35b359f5e29e7828aee737a34f535e855

Indexed text · page 150

Show all pages
Page 150

Proposed Supermarket Build 1: Main Street & Prospect Place PM Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (veh/h) 0 0 51 567 556 36 Future Volume (Veh/h) 0 0 51 567 556 36 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 Hourly flow rate (vph) 0 0 52 579 567 37 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 1268 586 604 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 1268 586 604 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 100 100 95 cM capacity (veh/h) 176 511 974 Direction, Lane # NB 1 SB 1 Volume Total 631 604 Volume Left 52 0 Volume Right 0 37 cSH 974 1700 Volume to Capacity 0.05 0.36 Queue Length 95th (ft) 4 0 Control Delay (s) 1.4 0.0 Lane LOS A Approach Delay (s) 1.4 0.0 Approach LOS Intersection Summary Average Delay 0.7 Intersection Capacity Utilization 70.8% ICU Level of Service C Analysis Period (min) 15 Build.syn Synchro 11 Light Report D&D Page 1

File revisions (1)