Supporting Documentation · May 6, 2026
PB 25 12 Application
99718697e29a016b4d2d11e4f87eeea35b359f5e29e7828aee737a34f535e855Indexed text · page 17
Show all pagesALL DOCUMENTS MUST BE PREPARED, Major Application 8 z Re 2 | 8 | gz ‘ S 8 Concept Plen Minor Application General Subdivision Site Plan is a a Development m= be Item Number — Deseription Subdivision | Site Plan Plan inary | Pinal | Preliminary | Final - ind proposed comour intervals GS. datum, Contours to extend least 200" beyond subject property as follows: up to 3% grade - 1" xX 3% 4 grade - 2! and subdivision fequires level of detail of Item 31 as opposed to 30. x x x x 32. em: Boundary, limits, nature und extent of wooded areas, specimen trees, and other significant physical features (detail may vary). x Comment: Basie for good planning x x x woe Xe aK.-.2|_% x x Evisting system of drainage of subject larger tract or busin of which itis a x x x x x x x x x x deemed necessary by Planning Board; not required xX at GDP stage because storm water management major subdivision x x x x x x plan because of potent ‘Only general location for electric, x x x x x x 1y infrastructure storm wi ric and cable TV. Information necessary for minor site x plan because of potential effect on utility systems, general location for telephone, cable TV required, x x x x x
File revisions (1)
- Sep 29, 2026
99718697e29a72,284,010 bytes