PB 25 04 Blue Violet Grow Draft Resolution

Preserved file SHA-25691907f69cbdd143f8f5bf5df3495e5c0099df9954cec58a3c056e44aeed4ac84

Indexed text · page 13

Show all pages
Page 13

13 the Board hereby reserves the right to withdraw, amend or supplant the instant approval. 4. All construction, use and development of the property shall be in conformance with the plans approved herein, all representations of the Applicant and its witnesses during the public hearing, all exhibits introduced by the Applicant, and all terms and conditions of this resolution. 5. The Applicant shall pay all outstanding application fees and technical review fees, as well as any inspection fees that may be required hereunder. The Applicant shall pay any additional fees or escrow deposits which may be due and owing within thirty (30) days of the notification or this approval shall be deemed withdrawn. 6. All notes included in the approved plans, including notes required by this Resolution, shall be deemed conditions of approval having the same force and effect as conditions expressly set forth in this Resolution. 7. Proof that a local license was obtained must be supplied to the Planning Department before a Certificate of Occupancy may be issued. 8. A list of the chemicals (the “MSDS Sheets”) for all pesticides and fertilizers utilized and the quantities kept on site for the business and their storage location depicted on the plans must be supplied to the Code Office. 9. Applicant shall install a generator, the location of which must be included on the site plan. Applicant shall provide all necessary design specifications for such a generator, including noise data to demonstrate that the generator will comply with all applicable State and local noise codes, within 30-days of the issuance of a certificate of occupancy, and the installation of such a generator shall not be a condition of zoning

File revisions (1)