Supporting Documentation · Feb 11, 2026

PB 25 04 Blue Violet Grow Draft Resolution

Preserved file SHA-25691907f69cbdd143f8f5bf5df3495e5c0099df9954cec58a3c056e44aeed4ac84

Indexed text · page 14

Show all pages
Page 14

14 compliance or occupancy; however, a generator shall be installed within 90 days of the issuance of the certificate of occupancy. 10. The Electric Vehicle parking space must be operational from the inception of the business. 11. Applicant shall repave or resurface or patch the parking lot of the Property at the direction and discretion and approval of the Zoning Officer. 12. Applicant shall stripe the parking spaces for use by its employees and properly designate the ADA parking space. A plan demonstrating the parking lot striping shall be submitted to the Planning Department and the Township Engineer. 13. Applicant shall provide emergency vehicle striping for the parking lot pavement. 14. Deliveries and product movement from the facility shall be by the Park Avenue ingress and egress only (with the exception of emergency vehicles which have use of the Ashland Avenue entrance). 15. No large trucks, box trucks or other vehicles larger than a sprinter van shall be permitted for pickup or delivery to the site. 16. Pressure controlled doors shall be installed at the entrance and exit of the cultivation site. 17. Applicant guarantees that all proposed landscaping will be maintained for two years. 18. Applicant shall submit a new easement to be reviewed by the Board attorney, Board engineer and with their approval filed and a filed copy shall be provided to the Code Office.

File revisions (1)