7A76b &')356Dÿ5gB679 &')ÿ'%!#!'ÿ(#)11!1%!'"2357ÿbBDÿ5Cÿ 56bgB6Ceg6ÿ@@7ÿbBDÿ5Cÿ56bgB6Ceg6ÿA76b7ÿbBDÿ5Cÿ 56bgB6Ceg6 '%"'1ÿ%13P567 )'%%%"'1ÿ%13B67g F$)!ÿ%'!"ÿ)#!03ÿ45 hs2sÿx4i3ÿ01p4ys261 5Beÿ7dÿU7gvÿw997ÿP56bdÿ47ÿx797d 7dÿU7gÿcgbgvÿy79B56ÿESÿUeÿErÿEWEz |s24shÿ}34i3 ~7ÿ5Beÿ7d SWSWEWEz t1347s261ÿx3476i3 4gbB56geÿP55@7gbB7ÿ5Beÿ7d ge7ÿEÿ5CÿE
APPENDIX E GEOTECHNICAL REPORT
CONSULTANTS, INC. Tel: (800) 545-ATUL A N 4405 South Clinton Avenue (908) 754-8383 South Plainfield, NJ 07080 Fax: (908) 754-8633 NJ EDA Approved Testing Laboratory * MBE/DBE Certified ® NJ DEP Certified www.ANSConsultants.net Soil, Concrete, Masonry, Rebar, Asphalt, Structural Steel, Precast, Piles, Caissons, Fire-proofing, Roofing, Soil Boring, Concrete/Rock Coring, UST Removal, Environmental Testing & Reports September 03, 2024 Gomes Management P.O. Box 5277 Newark, NJ 07105 Attn: Mr. Jose Pacheco Re: Subsurface Soil Investigation & Foundation Recommendation Report Proposed 1-story retail building 525 Northfield Avenue West Orange, NJ 07052 Block # 159.04, Lot # 1.01,1.02 & 1.03 Dear Mr. Pacheco, Enclosed, please find three (3) copies of the Subsurface Soil Investigation & Foundation Recommendation Report for the total of eight (8) Soil Borings performed on August 19, 2024; August 20, 2024 and August 21, 2024 at the project referenced above. Soil samples collected during soil boring program will be discarded after thirty (30) days from the date of this report, if not requested in advance to do otherwise. We thank you very much for providing us an opportunity to service you on this project. Should you have any questions or require additional information, please do not hesitate to contact the undersigned at (908)754-8383. Sincerely, ANS. Consultants, Inc. a Atulkumar N. Shah, PE, PP, F. ASCE President NJ PE License #24GE03443900 ANS/RM Reported: Gomes Management- (3); File — (1) File: ANV-6549_01.SB. “ANSwers to your construction inspection and testing needs.” ‘An equal opportunity employer
TABLE OF CONTENTS SCOPE OF SERVICES... PROPOSED CONSTRUCTION... SITE CONDITIONS... FIELD INVESTIGATION.. LABORATORY TESTING... SUBSURFACE CONDITIONS... SUMMARY OF FINDINGS.. GROUNDWATER......... SEASONAL HIGHWATER TABLE... CONCLUSIONG....... FOUNDATION DESIGN CRITERIA. FLOOR SLAB DESIGN CRITERIA....... BELOW GRADE WALLS..... RECOMMENDED SERVICES FOR EARTHWORK. MINIMUM PAVEMENT DESIGN SECTIONG........ RECOMMENDED SERVICES, LIMITATIONG............ APPENDIX - A.. GOOGLE MAP... SOIL BORING LOCATION PLAN...... SOIL BORING LOGS: B-1 to B- GENERALIZED SOIL PROFILE. .......0:::s0sess0000 SPT N-VALUE GRAPH ........... SEISMIC PARAMETERS ... SOIL CLASSIFICATION....... APPENDIX - B.. SIEVE ANALYSIS REPORT, SAMPLE # 1 to #8 ..... APPENDIX -C...... SOIL BORING PHOTOGRAPHG..............-.0-+5 Page No. 35-43 45-48
CONSULTANTS, INC. Tel: (800) 545-ATUL A N 4405 South Clinton Avenue (908) 754-8383 South Plainfield, NJ 07080 Fax: (908) 754-8633 NJ EDA Approved Testing Laboratory * MBE/DBE Certified * NJ DEP Certified www.ANSConsultants.net Soil, Concrete, Masonry, Rebar, Asphalt, Structural Steel, Precast, Piles, Caissons, Fire-proofing, Roofing, Soil Boring, Concrete/Rock Coring, UST Removal, Environmental Testing & Reports September 03, 2024 Gomes Management P.O. Box 5277 Newark, NJ 07105 Attn: Mr. Jose Pacheco Re: Subsurface Soil Investigation & Foundation Recommendation Report Proposed 1-story retail building 525 Northfield Avenue West Orange, NJ 07052 Block # 159.04, Lot # 1.01,1.02 & 1.03 Dear Mr. Pacheco, Enclosed, please find three (3) copies of the Subsurface Soil Investigation & Foundation Recommendation Report for the total of eight (8) Soil Borings performed on August 19, 2024; August 20, 2024 and August 21, 2024 at the project referenced above. The soil boring work was performed in accordance with our signed revised proposal dated July 25, 2024. Our Scope of Services included the following: tg Drilling and full-time inspection of total of eight (8) borings, down to 27'-0” deep or to refusal whichever comes first, recording of groundwater level or depth to bedrock if encountered in the contracted depth. 2: Performance of engineering evaluation to determine the stratification and physical properties of the subsurface materials and to develop and recommend appropriate type of foundation systems. 3. Preparation of a written report summarizing all findings and recommendations. PROPOSED CONSTRUCTION: The project site is located at 525 Northfield Avenue, West Orange, NJ in Essex County. At the present time, the subject site consists of 2-story masonry restaurant building with parking lot. We understand that a 1-story retail building is proposed at the subject site. Our recommendations are based upon NJ IBC-2021 ASCE 7-22 and construction material loads for the Building Construction based upon American National Standards. Please see location plan in Appendix-A for the exact location and photographs in Appendix-C for the existing site conditions. SITE CONDITIONS: The subject site is located towards north side of Northfield Avenue. The site was noted to be fairly leveled during soil boring activities. The subject site is noted to be
nditions. SITE CONDITIONS: The subject site is located towards north side of Northfield Avenue. The site was noted to be fairly leveled during soil boring activities. The subject site is noted to be primarily surrounded by commercial and residential properties. The subject property is located at approximately Latitude N 40° 46’ 13.75”, Longitude W 74° 16’ 38.96” on the USGS Digital elevation Model. It is at an approximate elevation of 385’ above mean sea level. See the site location plan in Appendix-A for more details. “ANSwers to your construction inspection and testing needs.” ‘An equal opportunity employer
Client: Gomes Management Project: 525 Northfield Avenue, West Orange, NJ Page: 2 Date: 09/03/2024 FIELD INVESTIGATION The soil boring locations were selected and marked by an ANS field representative based upon the location plan provided by the client and also based upon the equipment access. Surface utility mark-out was performed by New Jersey One-Call System. Underground utilities were also cleared by GPR solutions, a Private Utility Mark out Company on August 19, 2024. Once cleared, the soil boring work began on August 19, 2024. A total of eight (8) soil borings, B-1 to B-8 were drilled during the geo-technical investigation at the site are as follows: B-1 8/21/2024 - '-4) B-2/2A 8/21/2024 Hole collapsed at 7’-5” 11'-4” B-3 8/21/2024 Hole collapsed at 7’-2” g'-5" B-4 8/20/2024 Hole collapsed at 4’-4” 41'-2” B-5/5A 8/20/2024 Hole collapsed at 9'-2” 19’-9” B-6 8/20/2024 1" 25'-7" B-7 8/19/2024 Se 14-2” B-8 8/19/2024 8-9" 19-2” The soil boring locations are shown in the Soil Boring Location Plan which is included in Appendix-A. Soil boring work was performed under the direction and supervision of field Engineer Mr. Syed Abbas and Mr. Krunal Parmar. The borings were drilled using a 3” diameter hollow stem auger. Soil encountered was sampled continuously down to a depth of 12’-0" and then at 5’-0” interval down to augur refusal noted between 9’-5” to 19’-9” depth in borings B-1 to B-5, B-7 & B-8. Soil encountered was sampled continuously down to a depth of 12’-0” and then at 5’-0” interval down to spoon refusal noted at 25'-7” depth in boring B-6. Soil samples were extracted using a 2” diameter split spoon sampler as per the procedure specified in ASTM 1586-99. Samples for the boring were obtained by the Standard Penetration Test (SPT) Method (ASTM D 1586), which consists of driving a 2-inch outside-diameter split-spoon sampler into the soil with a 140-pound weight falling freely from a distance of 30 inches. The samplers were driven in four successive 6-inch increments, with the number of blows per increment being recorded. The number of blows required to advance the sampler in the middle 12 inches is termed as the Standard Penetration Resistance (N-value) and is presented on the Field Test Boring Logs in Appendix-A. During drilling operations, extracted soil samples were visually examined and classified by our Field Engineer. The soil sample
(N-value) and is presented on the Field Test Boring Logs in Appendix-A. During drilling operations, extracted soil samples were visually examined and classified by our Field Engineer. The soil sample description, Standard penetration test (SPT) blow counts and locations, strata changes, groundwater depth and other pertinent information were recorded on a detailed field log. Soil samples obtained from the split spoon sampler were visually classified according to the Unified Soil Classification System (USCS). LABORATORY TESTING: A total of eight (8) soil samples, one each from borings B-1 to B-8 were laboratory tested to determine in-place moisture content and to classify the soil as per Unified Soil Classification System, ASTM-D2487-93. The findings are summarized below. Laboratory test report are enclosed in Appendix -B.
Client: Gomes Management Project: 525 Northfield Avenue, West Orange, NJ Page: 3 Date: 09/03/2024 Soil Boring Soil Sample Depth Moisture Fines thru USCS Number No. collected Content (%) #200 Sieve Symbol B-1 S-1 2-4 10.9 31.1 GM B-2A S$-2 4-6 10.1 19.1 SM B-3 S-3 6-8 5.5 1.9 GP B-4 S-4 8'- 10" 8.2 21.0 GM B-5A $5 10-12" 58 24.7 SM BS $6 15-17" 13.3 28.8 SM B7 S7 4-6 75 23.7 SM B-8 $8 6-8 14.2 26.3 SM GM: silty gravels ‘SM: silty sands GP: poorly graded gravels SUBSURFACE CONDITIONS: Detailed description of the soil encountered in the test boring is documented in the boring log which is presented in Appendix-A. The following gives a general description of the subsurface conditions encountered at the borings. While the borings may indicate that the subsurface conditions appear to be relatively uniform across the site, it should be recognized that the size of borings was small compared to the size of the site, and that the existence of anomalies cannot be precluded. According to NJ Geoweb website, the geological formation is Rahway Till and geologic age is late Pleistocene, late Wisconsinan deposited directly from glacial ice during the late Wisconsinan glaciation. It consits of clayey silt to sandy silt with some to many pebbles and cobbles and few boulders; reddish brown, reddish yellow, yellowish brown, brown. As much as 100 feet thick, generally less than 40 feet thick. Based on the results of soil borings and our geo-technical laboratory testing, we estimate the general stratigraphy of the site to consist of the following major units, in an increasing order of depth. Stratum-1: Fill material containing very dark gray, brown/black silt, trace f/c sand, trace fic gravel, trace wood chip, trace fragments of concrete, and fill material containing brown, black silty fle sand, trace f/c gravel, trace fragments of asphalt & glass, plastic and fill material containing grayish brown f/c sand, trace silt, some f/c gray crushed stone and fill material containing dark gray, greenish gray clayey silt, trace f/c sand, trace fine gravel, trace fragments of asphalt was noted under this stratum in top 2’-6” in boring B-1, in top 4’ in B-2/2A, in top 4’-11” in B-3, in top 5” in B-4, in top 2’ in B-5/5A and in top 9” in B-8. No fill was noted in boring B-6 & B-7. The relative density of this material varied between loose to medium dense condition. The relative stiffness
5” in B-4, in top 2’ in B-5/5A and in top 9” in B-8. No fill was noted in boring B-6 & B-7. The relative density of this material varied between loose to medium dense condition. The relative stiffness of this material varied between soft to medium stiff condition. Stratum-2: Brown silt, trace fic sand, reddish brown silty f/c sand & f/c gravel, trace silt and reddish brown silt, trace f/c sand, trace f/m gravel was noted under this stratum between 4 feet to spoon refusal @ 4’-3” in boring B-1, between 10 feet to spoon refusal @ 10’-9” in boring B- 2/2A, between 2 feet to 4 feet & then between 6 feet to 10 feet in B-4, between 4 feet to down to spoon refusal @ 15’-3” in B-5/5A, between 2 feet to down to spoon refusal @ 25’-7” in B- 6, down to 12 feet in B-7, between 2 feet to 11 feet & then between 15 feet to 17 feet in B-8. The relative density of this material varied between very loose to very dense condition. The relative stiffness of this material varied between soft to stiff condition.