Supporting Documentation · Apr 15, 2026
Stormwater Management Report Revised as of 01282026 4936 0314 8685 v2
f6777d506bee83c79ba913bab178b45234e55066fd88f20823a02a45d6fdf50bIndexed text
FF-384.00 STAIR 5 L.F. 6" PVC ELEV #2 402.3 RENATA MALDONADO E REZENDE, AIA, LEED AP HDPE @ I.E. 377.75 2.16%
FF-384.00 ROOF ST. VEST. TO DP2 #2 No. 525
No. 525 4 L.F. 6" PVC @ 6.19% @ 5.20% C.O.
RIM: 392.61 STAIR
CHERYL SCHWEIKER, AIA STEVEN J. VAZ, PE
404 I.E. 384.50 FF-399.50
403 FF-387.00 #4 383
FF-385.80 FF-385.80 TRASH ROOM > Project:
> 38 388 DP2 > 385
38 401.9 403.2 525 NORTHFIELD AVENUE
File revisions (1)
- Sep 29, 2026
f6777d506bee6,037,476 bytes