Supporting Documentation · Apr 16, 2026
M_ZB 25 12_12 Knollwood Drive Ave Memo1
ba0ac4be7260ddf07e392c2dc44ace499b76bb3eefa5e28fe841d1798795f02aIndexed text · page 3
Show all pagesAN EQUAL OPPORTUNITY EMPLOYER www.westorange.org III. PROPOSAL 3.1 Provide steep slopes calculations confirming that disturbance is within the 0 to 10% slope range that allows 100% disturbance. Refer to section 25-28 of the Township’s ordinance; 3.2 The proposed improvements result in a reduction of 30.5 SF of impervious cover and therefore, below the 400 SF threshold for a Stormwater Minor Development permit which is defined in Section 25-29 of the Municipal Code; 3.3 The plans should show the type of restoration for the area showing the removal of the existing deck; 3.4 Signature blocks for the Board Engineer, Chairman and Secretary need to be added to the plan; 3.5 The location of roof leaders and downspouts for the proposed addition needs to be shown on the plans and not directed to adjacent properties; 3.6 Testimony should be provided indicating that there are no existing trees in the vicinity of the addition and deck reconstruction; 3.7 Provide soil movement calculations for the proposed improvements within the limit of disturbance; 3.8 A Soil erosion and sediment control plan with details needs to be provided and show the area of disturbance; 3.9 Prior to commencing construction activities, soil erosion and sediment control measures must be in place and maintain until the disturbed ground is permanently stabilized; IV. PERMITS Should the Board approve this application: 4.1 Soil removal permit will be required if more than 300 CY of soil will need to be moved. 4.2 A tree removal application and permit will be required from the Township Forester if any trees are to be removed. 4.3 We recommend an “As-Built Topographic Plan” be submitted once the construction is completed. Please contact us should you have any questions. ZC/jrm
File revisions (1)
- Sep 29, 2026
ba0ac4be7260573,350 bytes