Supporting Documentation · Apr 16, 2026
26 04 09 Engineering Review 7
b3bbe7e7344b341bd2649e08b88c19f6aefe0712952bc12151e3a231b82dbb51Indexed text · page 4
Show all pagesARTHEO?T PAGE | 4 BUILT ON LEGACY, DRIVEN BY PURPOSE a) Item #52 - Plans and legal documents for compliance with West Orange COAH Ordinances. Testimony was provided indicating that these documents will be provided as a condition of approval. Cc. STORMWATER MANAGEMENT COMMENTS 1. The Stormwater Management Operation and Maintenance Manual and any future revisions must be recorded upon the deed of record for the property. Prior to recording, the form of the deed must be approved by the Board Attorney and our office. D. LANDSCAPING AND FORESTRY COMMENTS 1. As stipulated in Section 25-12.1(0) and Section 28-4e.8., the Applicant must provide shade trees to create 50% shade for the parking areas within twenty-five (25) years; whereas it does not appear that the proposed landscaping will comply. Testimony was provided requesting relief from the requirement. E. LIGHTING COMMENTS 1. It remains for the Applicant to provide manufacturer's catalog cut sheets for the proposed light poles and provide full ordering information for all light fixtures and poles to prevent confusion during construction. The Applicant is hereby advised that any revised plans or other documents submitted to the Board should be accompanied by a cover letter which addresses each of the comments in this review letter and also details any other changes that have been made to the plans as these may not be readily apparent. H:\Legacy\Howoll-FS1\SEC\West Orange\Zoning Board\t 15. WRZ0153.VO1 - MPB Really LL.C\26-04-09 MPB Really - Review #7 docx
File revisions (1)
- Sep 29, 2026
b3bbe7e7344b270,992 bytes