Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 6, 2026

Final Engineering 262 270 Main

Preserved file SHA-256b5230880743413e6bb1d59464fa84c8de2b86147a796ff7401173badae7c90be

Indexed text

Page 3

PLANNING BOARD CHAIRMAN EXISTING CONCRETE WALKWAYS AND PAVED AREAS TO BE REMOVED. PLANNING BOARD SECRETARY PLANNING BOARD ENGINEER EXISTING 1 STORY BRICK STRUCTURE TO BE DEMOLISHED EXISTING CONCRETE WALKWAYS AND PAVED AREAS TO BE REMOVED. P L A N S W H I C H D O N O T B E A R

Page 3

P L A N S W H I C H D O N O T B E A R AN EMBOSSED SEAL ARE NOT VALID. EXISTING 1 STORY STRUCTURE TO BE ALL DOCUMENTS PREPARED BY HUDSON ENGINEERING, DEMOLISHED LLC ARE INSTRUMENTS OF SERVICE IN RESPECT OF THE PROJECT. THEY ARE NOT INTENDED OR REPRESENTED TO BE SUITABLE FOR REUSE BY OWNER OR OTHERS ON E X T E N S I ON S OF T HE P R O JE C T O R O N A N Y OT HE R

Page 3

E X T E N S I ON S OF T HE P R O JE C T O R O N A N Y OT HE R EXISTING SIDEWALK PROJECT. ANY REUSE WITHOUT WRITTEN VERIFICATION OR ADAPTATION BY HUDSON ENGINEERING, LLC FOR THE AREA TO BE SPECIFIC PURPOSE INTENDED WILL BE AT OWNERS SOLE DEMOLISHED RISK AND WITHOUT LIABILITY OR LEGAL EXPOSURE TO HUDSON ENGINEERING, LLC; AND OWNER SHALL INDEMNIFY AND HOLD HARMLESS HUDSON ENGINEERING, LLC FROM ALL CLAIMS,

Page 3

LLC FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES ARISING OUT OF OR RESULTING THEREFROM BY CHK ---- ---- ---- ----

Page 3

---- ---- ---- ---- ---- ----

Page 3

---- ---- ---- ---- ---- ---- ----

Page 3

---- ---- ---- ---- ---- ---- ----

Page 3

---- ---- ---- DATE ---- ----

Page 3

---- ---- ---- ---- ---- ---- ---- ----

Page 3

---- ---- ---- ---- ---- REVISION

File revisions (1)