Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 6, 2026

Final Engineering 262 270 Main

Preserved file SHA-256b5230880743413e6bb1d59464fa84c8de2b86147a796ff7401173badae7c90be

Indexed text

Page 3

---- ---- ---- ---- ---- ---- ----

Page 3

---- ---- ---- ---- ---- ----

Page 3

---- No. ---- ---- ---- ---- ---- ----

Page 3

---- ---- ---- ---- ---- ---- ----

Page 3

---- ---- NEW JERSEY 262-270 MAIN ST SITE REDEVLOPMENT DEMOLITION PLAN DEMOLITION PLAN 1 JORGE MASTROPIETRO ARCHITECTS C1.03 SCALE: 1/16"=1'-0"

Page 3

SCALE: 1/16"=1'-0" SITE CIVIL DESIGN DEMOLITION NOTES: 1. ALL WORK MUST CONFORM TO ALL REQUIREMENTS OF THE 2021 IBC NEW JERSEY EDITION, CHAPTER 33 AND NJAC 5:23-2.34. 2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. CONTRACTOR SHALL REPORT ALL DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS TO THE E.O.R. IN WRITING AND CEASE ALL ACTIVITIES ESSEX UNTIL GIVEN WRITTEN INSTRUCTION. 3. REFER TO PRE-DEMOLITION INVESTIGATION REPORT DATED 2/10/2025 FOR DEMOLITION SITE SAFETY REQUIREMENTS. 4. A WALKWAY SHALL BE PROVIDED FOR PEDESTRIAN TRAVEL IN FRONT OF CONSTRUCTION AND DEMOLITION SITE UNLESS GOVERNING AUTHORITY AUTHORIZES THE SIDEWALK TO BE FENCED OR CLOSED. A WALKWAY SHALL BE PROVIDED FOR PEDESTRIAN TRAVEL THAT LEADS FROM A BUILDING ENTRANCE OR EXIST OF AN OCCUPIED STRUCTURE TO A PUBLIC WAY. WALKWAYS SHALL BE ACCESSIBLE AND SUFFICIENT WIDTH TO ACCOMMODATE PEDESTRIAN TRAFFIC, BUT SHALL NOT BE LESS THAN 4 FEET IN WIDTH. 4.1. PEDESTRIAN TRAFFIC SHALL BE PROTECTED BY A DIRECTIONAL BARRICADE WHERE THE WALKWAY EXTENDS INTO THE STREET. THE DIRECTIONAL BARRICADE SHALL BE OF SUFFICIENT SIZE AND CONSTRUCTION TO DIRECT VEHICULAR TRAFFIC AWAY FROM THE PEDESTRIAN PATH. 5. BARRIERS SHALL BE NOT LESS THAN 8 FEET IN HEIGHT AND SHALL BE PLACED ON THE SIDE OF THE WALKWAY NEAREST THE

Page 3

WEST ORANGE CONSTRUCTION. BARRIERS SHALL EXTEND THE ENTIRE LENGTH OF THE CONSTRUCTION SITE. OPENINGS IN SUCH BARRIERS SHALL BE PROTECTED BY DOORS THAT ARE NORMALLY CLOSED. 6. PEDESTRIAN PROTECTION SHALL BE MAINTAINED IN PLACE AND KEPT IN GOOD ORDER FOR THE ENTIRE LENGTH OF TIME PEDESTRIANS ARE SUBJECT TO BEING ENDANGERED. 6.1. CONTRACTOR SHALL IMMEDIATELY REMOVE WALKWAYS, DEBRIS AND OTHER OBSTRUCTIONS AND LEAVE SUCH PUBLIC PROPERTY IN AS GOOD A CONDITION AS IT WAS BEFORE SUCH WORK WAS COMMENCED. 7. THE TEMPORARY USE OF STREETS OR PUBLIC PROPERTY FOR THE STORAGE OR HANDLING OF MATERIALS OR OF EQUIPMENT REQUIRED FOR CONSTRUCTION OR DEMOLITION, AND THE PROTECTION PROVIDED TO THE PUBLIC SHALL COMPLY WITH THE PROVISIONS OF THE APPLICABLE GOVERNING AUTHORITY. 8. CONSTRUCTION MATERIAL AND EQUIPMENT SHALL NOT BE PLACED OR STORED AS TO OBSTRUCT ACCESS TO FIRE HYDRANTS, STANDPIPES, FIRE OR POLICE ALARM BOXES, CATCH BASINS OR MANHOLES, NOR SHALL SUCH MATERIAL OR EQUIPMENT BE 0' 5' 10' 20' 30' 40' 50' 60' LOCATED WITHIN 20 FEET OF A STREET INTERSECTION, OR PLACED SO AS TO OBSTRUCT NORMAL OBSERVATIONS OF TRAFFIC DRAWN BY : DESIGN BY : CHECKED BY : SCALE : SIGNALS OR TO HINDER THE USE OF PUBLIC TRANSIT LOADING PLATFORMS. HP HP

Page 3

HP HP JC AS NOTED 9. BUILDING MATERIALS, FENCES, SHEDS OR ANY OBSTRUCTION OF ANY KIND SHALL NOT BE PLACED SO AS TO OBSTRUCT FREE SHEET #: APPROACH TO ANY FIRE HYDRANT, FIRE DEPARTMENT CONNECTION, UTILITY POLE, MANHOLE, FIRE ALARM BOX OR CATCH SCALE: 1/16" = 1'-0" DATE : 05/15/2025 C1.03 BASIN, OR SO AS TO INTERFERE WITH THE PASSAGE OF WATER IN THE GUTTER. PROTECTION AGAINST DAMAGE SHALL BE BINDING ORDER: JOB No. : PROVIDED TO SUCH UTILITY FIXTURES DURING THE PROGRESS OF THE WORK, BUT SIGHT OF THEM SHALL NOT BE OBSTRUCTED.

Page 3

JOB No. : PROVIDED TO SUCH UTILITY FIXTURES DURING THE PROGRESS OF THE WORK, BUT SIGHT OF THEM SHALL NOT BE OBSTRUCTED. JMA02P003.01 03 of 13

Page 4

1" 52 H U 4' CONCRETE FILLED 5.5" SCHEDULE 40 STEEL PIPE CONCRETE FILLED 5.5" 1' 1" 52 D S HE EXISTING GRADE A

File revisions (1)