Supporting Documentation · May 6, 2026
Final Engineering 262 270 Main
b5230880743413e6bb1d59464fa84c8de2b86147a796ff7401173badae7c90beIndexed text
---- ---- ---- ---- ----
---- ---- ---- ---- ----
---- 3" THICK LAYER OF 6" SHALL BE PLACED WITHIN THE TREE BED. SHREDDED BARK MULCH SECTION - ELEVATION 10.CUT AND REMOVE BURLAP FROM TOP 2/3 OF ROOT BALL, DATE X
X ---- ---- ---- ---- ----
---- ---- ---- ----
---- ---- ---- ---- REMOVE WIRE BASKET COMPLETELY. 11.FLOOD TREES WITH WATER WITHIN THE FIRST 24 HOURS OF 8' X 2" DIA. CEDAR STAKE, PLANTING. DRIVEN 30" INTO THE
X 12.NSTALL PHC TREE SAVER MYCORRHIZAL FUNGAL TRANSPLANT GROUND, SET OUTSIDE INOCULANT FOR TREES AND SHRUBS. INSTALL ONE 3 OUNCE ROOT BALL NOTES: PACKET PER CALIPER INCH OR PER 1 FOOT OF ROOTBALL DIA. 13.CONTRACTOR SHALL HAVE A GUARANTEE PERIOD OF 2 YEARS FINISHED GRADE 1. DO NOT PRUNE EVERGREEN SHRUBS EXCEPT TO REMOVE DEAD AND BROKEN FOR EACH TREE PLANTED. BRANCHES. THIN BRANCHES AND FOLIAGE (NOT ALL BRANCH TIPS) BY 1/3 RETAINING PLAN 14.TOPSOIL SHALL COMPLY WITH THE FOLLOWING REQUIREMENTS: NORMAL PLANT SHAPE. 14.1. NATURAL LOAM WITH THE ADDITION OF COMPOST OR HUMUS 2. SHRUBS SHALL BEAR THE SAME RELATIONSHIP TO GRADE AS IT BORE TO PREVIOUS
REVISION 14.2. ORGANIC MATTER CONTENT SHALL BE BETWEEN 5% - 12% GRADE IN NURSERY ---- ---- ----
---- ---- ---- ---- ----
---- ---- ---- ----
File revisions (1)
- Sep 29, 2026
b5230880743449,292,919 bytes