Final Engineering 262 270 Main

Preserved file SHA-256b5230880743413e6bb1d59464fa84c8de2b86147a796ff7401173badae7c90be

Indexed text

Page 6

---- ---- ---- ---- ----

Page 6

---- ---- ---- ---- ----

Page 6

---- 3" THICK LAYER OF 6" SHALL BE PLACED WITHIN THE TREE BED. SHREDDED BARK MULCH SECTION - ELEVATION 10.CUT AND REMOVE BURLAP FROM TOP 2/3 OF ROOT BALL, DATE X

Page 6

X ---- ---- ---- ---- ----

Page 6

---- ---- ---- ----

Page 6

---- ---- ---- ---- REMOVE WIRE BASKET COMPLETELY. 11.FLOOD TREES WITH WATER WITHIN THE FIRST 24 HOURS OF 8' X 2" DIA. CEDAR STAKE, PLANTING. DRIVEN 30" INTO THE

Page 6

X 12.NSTALL PHC TREE SAVER MYCORRHIZAL FUNGAL TRANSPLANT GROUND, SET OUTSIDE INOCULANT FOR TREES AND SHRUBS. INSTALL ONE 3 OUNCE ROOT BALL NOTES: PACKET PER CALIPER INCH OR PER 1 FOOT OF ROOTBALL DIA. 13.CONTRACTOR SHALL HAVE A GUARANTEE PERIOD OF 2 YEARS FINISHED GRADE 1. DO NOT PRUNE EVERGREEN SHRUBS EXCEPT TO REMOVE DEAD AND BROKEN FOR EACH TREE PLANTED. BRANCHES. THIN BRANCHES AND FOLIAGE (NOT ALL BRANCH TIPS) BY 1/3 RETAINING PLAN 14.TOPSOIL SHALL COMPLY WITH THE FOLLOWING REQUIREMENTS: NORMAL PLANT SHAPE. 14.1. NATURAL LOAM WITH THE ADDITION OF COMPOST OR HUMUS 2. SHRUBS SHALL BEAR THE SAME RELATIONSHIP TO GRADE AS IT BORE TO PREVIOUS

Page 6

REVISION 14.2. ORGANIC MATTER CONTENT SHALL BE BETWEEN 5% - 12% GRADE IN NURSERY ---- ---- ----

Page 6

---- ---- ---- ---- ----

Page 6

---- ---- ---- ----