---- 14.3. THE pH SHALL BE IN THE RANGE OF 6.0 TO 7.0 INCLUSIVE, 8' LONG 2" DIA CEDAR 3. INSTALL PHC TREE SAVER MYCORRHIZAL FUNGAL TRANSPLANT INOCULANT. INSTALL UNLESS OTHERWISE APPROVED OR SPECIFIED. STAKES SET OUTSIDE ONE 3 OUNCE PACKET PER CALIPER INCH OR PER 1 FOOT OF ROOTBALL DIA. FOR RHODODENRONS, AZALEAS AND MOUNTAIN LAURELS USE ERICOID MYCORRHIZAL NTS UNDISTURBED GRADE OF ROOTBALL 14.4.SOIL TEXTURAL ANALYSIS: TOP SOIL SHALL CONSIST OF THE FUNGI. FOLLOWING PERCENTAGES OF SAND, SILT, AND CLAY. ANY SCARIFY EDGES 4. WATER PLANTS THOROUGHLY AFTER PLANTING. SOIL THAT DOES NOT MEET THE REQUIREMENTS BELOW WILL OF EXCAVATION BE REJECTED AND REMOVED FROM THE SITE.

Page 6

ING. SOIL THAT DOES NOT MEET THE REQUIREMENTS BELOW WILL OF EXCAVATION BE REJECTED AND REMOVED FROM THE SITE. ROCKS, STONE AND GRAVEL >2.0 mm BACKFILL WITH NEW <5% SAND (0.05-2.0 mm) TOPSOIL 40 - 60% SILT (0.002 - 0.05mm) 20 - 50% NTS No. 2.5 x ROOTBALL DIAMETER ----

Page 6

---- ---- ---- ---- ---- ----

Page 6

---- ---- ---- ---- ----

Page 6

---- ---- ---- CLAY (<0.002 mm) 20% MAXIMUM 14.5. WHEN TOPSOIL OTHERWISE COMPLIES REQUIREMENTS OF THE SPECIFICATION BUT SHOWS A WITH THE 3 SHRUB AND GROUNDCOVER PLANTING DETAIL DEFICIENCY IN ORGANIC MATTER, COMPOST MAY BE INCORPORATED WHEN AND AS PERMITTED BY THE C1.06 SCALE: N.T.S FORESTER.

Page 6

C1.06 SCALE: N.T.S FORESTER. NEW JERSEY 15.ROOT BALL SIZE RELATIVE TO TREE HEIGHT SHALL BE WITHIN THE RANGES SET BY THE AMERICAN NURSERY STANDARDS 262-270 MAIN ST SITE REDEVLOPMENT TYPICAL TREE PLANTING DETAIL SHADE TREE DETAILS 2 C1.06 SCALE: N.T.S JORGE MASTROPIETRO ARCHITECTS

Page 6

JORGE MASTROPIETRO ARCHITECTS BRANCH SECOND CUT (4) 2"X4"X8'-0" STAKES BARK FIRST CUT SITE CIVIL DESIGN 2"X4" TREE GUARD POST RIDGE FINAL CUT 2"X4" SHIM INSTALLED FROM BOTTOM OF

Page 6

F BRANCH POST CAP TO 6" COLLAR 6" BEYOND POST CAP USE 8dX3" NAILS TREE LIMB REMOVAL ESSEX STEEL POST 2'-6" ANCHOR W/ CAP TREE GUARD SHALL BE EXISTING TREE TO BE INSTALLED AT THE EDGE OF

Page 6

INSTALLED AT THE EDGE OF PROTECTED THE TREE PIT STEEL ANCHOR - ENLARGEMENT EXISTING TREE 4'-0" TALL SNOW FENCE ATTACHED TO 7'-0" TALL STEEL POSTS SET INTO GROUND TREE WRAP (8) 2"X4" (LENGTH VARIES) (2) 2"X4" CROSS BRACES WEST ORANGE

Page 6

WEST ORANGE FASTEN ORANGE SNOW FENCE TO WOOD TREE FENCE, ALL EXISTING STREET CURB SIDES EXISTING SIDEWALK NOTES: 6'-0" 1. SNOW FENCING SHOULD BE INSTALLED AT DRIP LINE OF TREE BRANCHES. 2. NO BOARDS ARE TO BE NAILED TO TREES. SURFACE PROTECTION MATS 3. FEEDER ROOTS SHOULD NOT BE CUT INSIDE THE TREE BRANCHES DRIP LINE. 4. TREE LIMB REMOVAL, WHERE NECESSARY, WILL BE DONE TO TRUNK OR MAIN BRANCH. 6" DEPTH WOOD CKIP MULCH