Supporting Documentation · May 6, 2026
Final Traffic Impact Analysis
Preserved file SHA-256
aec2e510e606a1af2c38c73e89ce552d1a1d437a9696db16e214e314aaf50cfeIndexed text · page 7
Show all pagesimpacts. Typically, traffic impact studies are performed for new uses that generate 100 or more new trips in an hour, based on the ITE Manual of Transportation Engineering Studies and as required by the NJDOT State Highway Access Management Code All vehicle trips were routed through the adjacent roadway network based on the observed existing roadway distributions of traffic in the neighborhood. The projected site-generated traffic volumes are summarized on appended Figures 4a, 4b and 4c. PROPOSED GROCERY STORE TOWNSHIP OF WEST ORANGE, ESSEX COUNTY PAGE 6 MARCH 11, 2026
File revisions (1)
- Sep 29, 2026
aec2e510e6068,330,716 bytes