Supporting Documentation · May 6, 2026
M_Biondi 15 Ridgeway Avenue Bl 158 L 2801 Review 1
7a4df9c08ba427f5bf68df8ce7430b68d735d674c3116f2bd8fba3ae05764c6dIndexed text · page 3
Show all pagesAN EQUAL OPPORTUNITY EMPLOYER www.westorange.org The minor subdivision and the construction of two new single-family dwellings will impact drainage, utilities, impervious coverage, access by sharing a common driveway. The application should be fully review by the Planning Board as a whole to evaluate the cumulative impact and how the applicant will address stormwater management, slopes, and soil removal ordinances. The following should be incorporated into future submittals to the Land Use Board; 1. The Applicant shall revise the Existing Conditions and Demolition Plan to include existing topography of the site including corner lot elevations, contour and floor elevation of existing structures to remain if any; 2. The “Proposed Condition Plot Plan” provided has not been revised to reflect the expanded scope of the work that differs from original application and does not contain the information necessary to review this application. The Applicant shall revise the plan in accordance with Sections 25-29 and 25-51.6 of the Township Code.; 3. The revised “Proposed Condition Plot Plan” shall include, but is not limited to: a. Topographic base map. The design engineer shall provide sufficient topographic and location data that shows existing contours, at a scale of no greater than one-inch equals 30 feet, to allow the Township Engineer to make an appropriate evaluation of the development proposal. The base map should include, but is not limited to; existing structures, existing patios and/or walkways, existing trees and landscape areas, and existing utilities. The topography and existing conditions must be based on a plan prepared by a NJ licensed surveyor; b. Project development plans. A map at the scale of the topographical base map indicating the location of existing and proposed buildings, proposed contours and other improvements shall be provided; c. Grading and drainage/stormwater management facilities map illustrated on a map of the same scale as the topographic base map, the following shall be included; i. Total area to be disturbed, paved, or built upon, proposed surface contours, land area to be occupied by the stormwater management facilities and the type of vegetation thereon; ii. Existing and proposed contours; iii. Existing and proposed spot elevations at building corners, property conrners, street gutter line, top of curb, top of depressed curb, top
f vegetation thereon; ii. Existing and proposed contours; iii. Existing and proposed spot elevations at building corners, property conrners, street gutter line, top of curb, top of depressed curb, top and bottom of wall and around structures; iv. Existing and proposed utility connections to the existing and proposed structures; v. Finished floor, basement/cellar and garage floor elevations; vi. Location of roof leaders; vii. Design and calculations of the proposed stormwater management facility, if required;
File revisions (1)
- Sep 29, 2026
7a4df9c08ba4462,411 bytes