Supporting Documentation · May 28, 2026
Traffic Impact Study 021226 resubmissionrcd 2 26 2026
7a90898f5ecd279b745ee8ca97c767a8f7a155a66e5785b96f6447fdbee3c4dfIndexed text
PHF .000 .250 .000 .250 .000 .375 .000 .375 .000 .625 .000 .625 .550 .000 .550 .750 Cars 0 1 0 1 0 3 0 3 0 10 0 10 22 0 22 36 % Cars 0 100 0 100 0 100 0 100 0 100 0 100 100 0 100 100 Trucks (SU) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Trucks (SU) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Trucks (TT) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Trucks (TT) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ROUTE 577 (South to North) Mile Posts: 8.000 - 11.000 Secondary Direction Primary Direction Pavement 30 26 Shoulder Number of Lanes 3 2 Speed Limit
40 Street Name Prospect Avenue Interstate West Orange Twp, Essex Co Secondary Direction 287 Route 508 677 10 (8.05) LAWRENCE AVE (8.11) HELEN AVE (8.15) WALKER
(8.11) HELEN AVE (8.15) WALKER (8.31) WINDING WAY (8.48) FOREST HILL (8.56) CLUB BLVD (8.58) VOSSELER TER (8.75) GREGORY PL (9.23)
HUTTON AVE (10.32) ROONEY CIR (10.43)
TO SHOPPING CTR (10.92) TO CR 577 US Route 22 280 MT PL
MT PL PROS NJ Route FOR SCHOOL 33 NORTHFIELD (10.79)
EASA (10.11 (9.07) (9.99) PECT County
(10.87) Road 689 NT AV ) AVE Interchange
AVE Interchange E Number 2 Grade Separated Interchange MT PL STREAM Traffic ORANGE HGHTS AVE (9.73) BRADLEY TER Signal AVENUE
File revisions (1)
- Sep 29, 2026
7a90898f5ecd6,686,365 bytes