Supporting Documentation · May 6, 2026
Report 4 13 2026
e043d495fcedc3c9f69247133d4a66bb2eba4dd398622fa176b144b0e20391d8Indexed text · page 10
Show all pagesENSURPLAN, INC. ww.Ensurplan.net w ivil Engineers & Land Surveyors C Ph: (732) 469-0400 Certificate of Authorization 24GA27997700 STORMWATER DRAINAGE REPORT 04/13/26 Minor Subdivision 15 Ridgeway Ave West Orange, NJ Design Methodology/Discussion(continued) Projected Intensity Storm Pre Construction Rate Maximum Post Construction Rate 2 Year Storm 0.57 cfs 0.29 cfs 0.26 cfs 10 Year Storm 1.31 cfs 0.98 cfs 0.90 cfs 100 Year Storm 3.17 cfs 2.54 cfs 2.33 cfs Stormwater Recharge Requirements o comply with the Major Stormwater regulations recharge requirements, stormwater T management measures shall be designed to demonstrate through hydrologic and hydraulic analysis that the increase of stormwater runoff volume from pre-construction to post-construction for the projected two-year storm, as defined and determined pursuant to N.J.A.C. 7:8- 5.7(d), is infiltrated. Design Methodology/Discussion echarge has been provided by the use of a small scale infiltration basin and has been R analyzed by utilizing the New Jersey Groundwater Recharge Spreadsheet (NJGRS) s the NJGRS cannot model infiltration from a system which is simultaneously discharging A outflow through an orifice the study area is limited to a 2” thick stone bed set below the system outlet.The BMP variable is the depth from the surface invert of the discharge orifice or 48”. The depth to the lower surface is 50” and the effective depth of the BMP is 1.6” or 0.4 voids x 2” stone depth. 9 Mailing Address: Post Office
stone depth. 9 Mailing Address: Post Office Box 4304, Warren, NJ 07059
File revisions (1)
- Sep 29, 2026
e043d495fced10,160,333 bytes