Supporting Documentation · May 6, 2026
Report 4 13 2026
e043d495fcedc3c9f69247133d4a66bb2eba4dd398622fa176b144b0e20391d8Indexed text · page 2
Show all pagesENSURPLAN, INC. ww.Ensurplan.net w ivil Engineers & Land Surveyors C Ph: (732) 469-0400 Certificate of Authorization 24GA27997700 STORMWATER DRAINAGE REPORT 04/13/26 Minor Subdivision 15 Ridgeway Ave West Orange, NJ Introduction and Major Stormwater Justification his report has been prepared to demonstrate that the runoff from the proposed improvements T to the site, which result in an increase of impervious coverage, is properly mitigated in accord with the Township of West Orange requirements for a major stormwater project, and will pose no negative impact to any surrounding downstream properties. o ensure that the design complies with the requirements and goals of the Township Stormwater T Ordinance a detailed analysis of the site condition was performed. A soils evaluator tested various areas of the site to identify both seasonal high water levels and the ability of the soil to infiltrate runoff. Additionally areas allowing for use of low impact development were identified; including potential preservation of large deciduous trees, lessening the slope of surfaces and elongation of drainage paths. This study focused the design on the area of the site which would allow for use of infiltration. small scale sub-surface extended detention infiltration basin (a system allowing for infiltration A and controlled release) was chosen as the green infrastructure BMP to provide infiltration, recharge and reduction of runoff quantity. The basin is located at the area of the site where the soils evaluation determined an acceptable infiltration rate for design (A factor of safety was applied to the analysis by utilizing ½ of the measured infiltration rate in all calculations). he basin shall be a shared system, accepting runoff from both lots, therefore an easement T allowing for common use and maintenance shall be established. Operations and maintenance requirements and responsibilities shall be filed with the record owner deeds. ermeable
e an easement T allowing for common use and maintenance shall be established. Operations and maintenance requirements and responsibilities shall be filed with the record owner deeds. ermeable pavement, another green infrastructure BMP, is specified for all driveway surfaces. P This system is rated for 80% total suspended solids reduction providing water quality treatment for the site. he analysis shows that the runoff from the developed portion of the site directed towards the T infiltration basin when combined with the runoff rate from the developed portions of the site which bypass the system, has been reduced to no more than 50% of the two year storm rate. 75% of the 10 year storm rate and 80% for the 100 year storm rate from what would have occurred if the design area were an undeveloped wooded lot. 2 Mailing Address: Post Office Box 4304, Warren, NJ 07059
File revisions (1)
- Sep 29, 2026
e043d495fced10,160,333 bytes