Supporting Documentation · May 6, 2026
Report 4 13 2026
e043d495fcedc3c9f69247133d4a66bb2eba4dd398622fa176b144b0e20391d8Indexed text · page 8
Show all pagesENSURPLAN, INC. ww.Ensurplan.net w ivil Engineers & Land Surveyors C Ph: (732) 469-0400 Certificate of Authorization 24GA27997700 STORMWATER DRAINAGE REPORT 04/13/26 Minor Subdivision 15 Ridgeway Ave West Orange, NJ Design Discussion (continued) he below grade infiltration basin has been sized as required to restrict the volumes of the T design storms and provide the necessary reductions in rate. It is also required that the designed pond volume can drain within 72 hours via infiltration. The maximum storage for the projected 100 year storm is 3,667 cf. Time to empty: (3,667 cf max / (125.5’ x 12.75’) sf flat bottom) x 12”/ft / 0.5”/hr = 55 hrs The maximum volume within the pond 4,026 cf. Time to empty: (4,026 cf max / (125.5’ x 12.75’) sf flat bottom) x 12”/ft / 0.5”/hr = 60 hrs he infiltration rate utilized in the design analysis is 0.5”/hour which is half of the infiltration rate T measured of 1.00”/hr at the soil log situated within the infiltration bed. 7 Mailing Address: Post Office Box 4304, Warren, NJ 07059
File revisions (1)
- Sep 29, 2026
e043d495fced10,160,333 bytes