Supporting Documentation · May 6, 2026
Response Letter 1 To Board Engineer 15 Ridgeway West Orange
bf17291b7c4e83ed7e70a06d6e1701d41ab5f797888a10369c213145e9e9d76eIndexed text · page 2
Show all pagesENSURPLAN, INC. www.Ensurplan.net Civil Engineers & Land Surveyors Ph: (732) 469-0400 Certificate of Authorization 24GA27997700 Mr. Ryan MacNeill, PE 4/21/26 West Orange Township Planning Board Engineer Page 2/2 RE: Revised plans - Minor Subdivision Major Stormwater Management Review 15 Ridgeway Ave C6. The existing conditions survey depicting improvements to be removed now notes the intended removal of the fence. C7. The design plan depicts disturbance in excess of 0.5 acres and is considered a Major Stormwater Development. 8(a-d) Items have been addressed in plan revisions and stormwater reports. 9 No longer applicable 10 Alternate methods of stormwater mitigation are now proposed. 11. A checklist regarding stormwater requirements has been added to plan sheet one. 12 Revised architects plan shall be supplied. 13. Listing of anticipated approvals is shown on plan sheet one and the applicant will supply proofs of approval when available. I hope that the information above has been helpful in your review of these revised plans. Thank you very much for your assistance with this project, Regards, William Scott, PE, CME 2 Mailing Address: Post Office Box 4304, Warren, NJ 07059
File revisions (1)
- Sep 29, 2026
bf17291b7c4e66,714 bytes