Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · May 6, 2026

Response Letter 1 To Board Engineer 15 Ridgeway West Orange

Preserved file SHA-256bf17291b7c4e83ed7e70a06d6e1701d41ab5f797888a10369c213145e9e9d76e

Indexed text · page 2

Show all pages
Page 2

ENSURPLAN, INC. www.Ensurplan.net Civil Engineers & Land Surveyors Ph: (732) 469-0400 Certificate of Authorization 24GA27997700 Mr. Ryan MacNeill, PE 4/21/26 West Orange Township Planning Board Engineer Page 2/2 RE: Revised plans - Minor Subdivision Major Stormwater Management Review 15 Ridgeway Ave C6. The existing conditions survey depicting improvements to be removed now notes the intended removal of the fence. C7. The design plan depicts disturbance in excess of 0.5 acres and is considered a Major Stormwater Development. 8(a-d) Items have been addressed in plan revisions and stormwater reports. 9 No longer applicable 10 Alternate methods of stormwater mitigation are now proposed. 11. A checklist regarding stormwater requirements has been added to plan sheet one. 12 Revised architects plan shall be supplied. 13. Listing of anticipated approvals is shown on plan sheet one and the applicant will supply proofs of approval when available. I hope that the information above has been helpful in your review of these revised plans. Thank you very much for your assistance with this project, Regards, William Scott, PE, CME 2 Mailing Address: Post Office Box 4304, Warren, NJ 07059

File revisions (1)