Supporting Documentation · Jun 3, 2026
3 Site Plan Application Checklist
3f1033b4d05838082b774a77efd042dd0984eac7dd067cafa8cfcd5040ac544cIndexed text · page 1
Show all pagesSite Plan/Subdivision Checklist TOWNSHIP OF WEST ORANGE APPLICANT: ALL DOCUMENTS MUST BE PREPARED, SIGNED AND SEALED RY NEW JERSEY LICENSED PROFESSIONAL Pre-Application - Concept Plan Major Application Minor Application Generat Subdivision Site Plan lem Number Description Development Site Plan Plan Subdivision Preliminary Final | Preliminary | Final aa1dWoo ALZTINOON} = auisanoay UAV 1 PROJECT-PLAT INFORMATION 1. em: Name, address of owner and applicant. *< 2. Ment: Nang, signature, license umber, seal and address of cayincer, land surveyor, atchitect, professional planner, and/or landseape architect, as ‘applicable, involved in preparation of plat 3. lem; ‘Title bluck denoting type of application, tax ‘ap sheet, county, naune of nunleipality, block & lot, and street location, A. [tem: A key mup ut specilied scale showing location Of tract with reference to surrounding properties, streets, ‘suunicipal boundaries, ele, within 300° Conment: Describes settings may be less detailed in bee-application-coneep! plas and GDP stages. 5, lng A gehedule of required end provided zone districi(s) requirements ineluding lol area, width, depth, yard setbacks, building coverage, open space, parking, ete, Cumment: Schedule may be less detailed in pre- ‘application-concept plan sinses, 6. ligne: North arrow and scale. 7. ene: Proof that taxes are current nature blocks for Chuinnan, Secretary and Municipal Engineer, 9. Lisin: Appropriate cenification blocks as requiced by Map Filing Law, x | x |< [>< 0, Ken: Monumemtation as specified by Map Filing Law Comment: Monunen subdivision, ion required only for final 11, isu: Date of current propery survey, Cominent: Required by Map Filing Lavy for final subdivision and site plan; necessary for vesting on GOP.
File revisions (1)
- Sep 29, 2026
3f1033b4d0581,761,808 bytes