Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 3, 2026

12 2026 02 12 Crestmont CC Stormwater Management Report

Preserved file SHA-256af4b3e068e3e8fd5e13ba0340f7139ca27c9c412a037f50ebc781a156e29509e

Indexed text

Page 862

= = = = = = APPENDIX E TABLE OF CONTENTS WATER QUALITY CALCULATIONS REQUIRED TSS REMOVAL CALCULATIONS PROPOSED TSS REMOVAL CALCULATIONS NJDEP WATER QUALITY DESIGN STORM ROUTINGS SSBB-1 SSBB-2 PAPS-1 SUMMARY SMALL-SCALE BIORETENTION BASIN DESIGN SUMMARY POROUS ASPHALT PAVEMENT DESIGN CALCULATIONS

Page 863

WATER QUALITY CALCULATIONS

Page 864

REQUIRED TSS REMOVAL CALCULATIONS

Page 865

CRESTMONT COUNTRY CLUB EAGLE ROCK AVE IMPROVEMENTS LANGAN PROJECT #101049802 REQUIRED TSS REMOVAL RATE CALCULATIONS CRESTMONT COUNTRY CLUB & EAGLE ROCK AVE IMPROVEMENTS LANGAN PROJECT #101049802 Existing Motor Existing Motor Existing Non-Motor Existing Non-Motor Vehicle Surface to Point of Vehicle Surface to Vehicle Surface to Vehicle Surface to Proposed Motor Analysis Proposed Motor Proposed Motor Proposed Motor Vehicle Surface Vehicle Surface (SF) Vehicle Surface (SF) Vehicle Surface (AC) (AC) POA-1 & POA-2 27,536 0.63 37,125 0.85 Required TSS Removal Rate = (0.63*0.50) + (0.85*0.80) 1.48 = 67.2% \\langan.com\data\PAR\data8\101049801\Project Data\_Discipline\Site Civil\Stormwater\Eagle Rock WQ Calcs

Page 866

PROPOSED TSS REMOVAL CALCULATIONS

Page 867

CRESTMONT COUNTRY CLUB EAGLE ROCK AVE IMPROVEMENTS LANGAN PROJECT #101049802 PROPOSED TSS REMOVAL RATE CALCULATIONS FLOWING TO PACKANACK BROOK CRESTMONT COUNTRY CLUB & EAGLE ROCK AVE IMPROVEMENTS LANGAN PROJECT #101049802 Proposed 80% Proposed 80% Proposed 90% Proposed 90% Point of No Treatment No Treatment TSS Removal TSS Removal TSS Removal TSS Removal Analysis (SF) (AC) Rate (SF) Rate (AC) Rate (SF) Rate (AC) POA-1 & POA-2 60,650 1.39 20,347 0.47 17,156 0.39 Proposed TSS Removal Rate = (1.39*0.8) + (0.47*0.90) + (0.39*0) 2.25 = 68.2% \\langan.com\data\PAR\data8\101049801\Project Data\_Discipline\Site Civil\Stormwater\Eagle Rock WQ Calcs

Page 868

= = = = = = NJDEP WATER QUALITY DESIGN STORM ROUTINGS

Page 869

SSBB-1

Page 870

Hydrograph Report File: Eagle Rock Proposed (Future).hys Hydrology Studio v 3.0.0.39 10-21-2025 PR-1A Routing Hyd. No. 11 Hydrograph Type = Pond Route Peak Flow = 0.000 cfs Storm Frequency = 2-yr Time to Peak = 61 min Time Interval = 1 min Hydrograph Volume = 0.001 cuft Inflow Hydrograph = 10 - PR-1A Total Max. Elevation = 534.52 ft Pond Name = SSBB-1 Max. Storage = 2,487 cuft Pond Routing by Storage Indication Method Center of mass detention time = 2.59 hrs Qp = 0.000 cfs 3 2 1 0 -1 0 10 20 30 40 50 60 70 80 Time (min) Req'd Stor PR-1A Total PR-1A Routing

Page 871

Pond Report File: Eagle Rock Proposed (Future).hys Hydrology Studio v 3.0.0.39 10-21-2025 SSBB-1 Stage-Storage User Defined Contours Stage / Storage Table Description Input Stage Elevation Contour Area Incr. Storage Total Storage (ft) (ft) (sqft) (cuft) (cuft) Bottom Elevation, ft 534.00 0.00 534.00 4,713 0.000 0.000 Voids (%) 100.00 1.00 535.00 4,938 4,825 4,825 Volume Calc Conic 2.00 536.00 5,145 5,041 9,865 3.00 537.00 5,354 5,249 15,114 4.00 538.00 5,649 5,500 20,614 5.00 539.00 6,413 6,026 26,641 Stage-Storage 539 5 538 4 537 3 536 2 535

File revisions (1)