Supporting Documentation · Jun 3, 2026
12 2026 02 12 Crestmont CC Stormwater Management Report
af4b3e068e3e8fd5e13ba0340f7139ca27c9c412a037f50ebc781a156e29509eIndexed text · page 865
Show all pagesCRESTMONT COUNTRY CLUB EAGLE ROCK AVE IMPROVEMENTS LANGAN PROJECT #101049802 REQUIRED TSS REMOVAL RATE CALCULATIONS CRESTMONT COUNTRY CLUB & EAGLE ROCK AVE IMPROVEMENTS LANGAN PROJECT #101049802 Existing Motor Existing Motor Existing Non-Motor Existing Non-Motor Vehicle Surface to Point of Vehicle Surface to Vehicle Surface to Vehicle Surface to Proposed Motor Analysis Proposed Motor Proposed Motor Proposed Motor Vehicle Surface Vehicle Surface (SF) Vehicle Surface (SF) Vehicle Surface (AC) (AC) POA-1 & POA-2 27,536 0.63 37,125 0.85 Required TSS Removal Rate = (0.63*0.50) + (0.85*0.80) 1.48 = 67.2% \\langan.com\data\PAR\data8\101049801\Project Data\_Discipline\Site Civil\Stormwater\Eagle Rock WQ Calcs
File revisions (1)
- Sep 29, 2026
af4b3e068e3e295,851,182 bytes