Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 3, 2026

12 2026 02 12 Crestmont CC Stormwater Management Report

Preserved file SHA-256af4b3e068e3e8fd5e13ba0340f7139ca27c9c412a037f50ebc781a156e29509e

Indexed text · page 19

Show all pages
Page 19

Table 16 – POA-1 Peak Discharge Summary – Future Storm Events POA-1 Design Storm Event Existing Peak Allowable Peak Proposed Peak Discharge (CFS) Discharge (CFS) Discharge (CFS) 2-Year 16.83 15.52 14.07 10-Year 29.21 27.85 24.77 100-Year 58.39 56.05 53.61 Table 17 – POA-2 Peak Discharge Summary – Current Storm Events POA-2 Design Storm Event Existing Peak Allowable Peak Proposed Peak Discharge (CFS) Discharge (CFS) Discharge (CFS) 2-Year 9.63 7.23 5.67 10-Year 17.05 14.95 10.31 100-Year 32.74 29.56 23.96 Table 18 – POA-2 Peak Discharge Summary – Future Storm Events POA-2 Design Storm Event Existing Peak Allowable Peak Proposed Peak Discharge (CFS) Discharge (CFS) Discharge (CFS) 2-Year 11.97 9.00 7.27 10-Year 21.02 18.44 14.02 100-Year 42.47 38.36 31.63 3.2 Stormwater Quality Design 3.2.1 Design Criteria The project site is subject to water quality treatment requirements as the redevelopment results in an increase in regulated motor vehicle surface coverage. In accordance with N.J.A.C. 7:8- 5.5.(a), major developments are subject to providing water quality treatment when the development results in an increase of one-quarter acre or more of regulated motor vehicle surface. The proposed redevelopment results in approximately 0.85± acres of new regulated motor vehicle surface within the limit of disturbance. Refer to Figure 8 – Required Water Quality Treatment Map for the total area of

Page 19

edevelopment results in approximately 0.85± acres of new regulated motor vehicle surface within the limit of disturbance. Refer to Figure 8 – Required Water Quality Treatment Map for the total area of regulated motor vehicle surface that is subject to treatment 16

File revisions (1)