12 2026 02 12 Crestmont CC Stormwater Management Report
af4b3e068e3e8fd5e13ba0340f7139ca27c9c412a037f50ebc781a156e29509eIndexed text · page 750
Show all pagesHydrograph Report File: Eagle Rock Proposed (Current).hys Hydrology Studio v 3.0.0.39 10-21-2025 PR-2B Routing Hyd. No. 57 Hydrograph Type = Pond Route Peak Flow = 0.283 cfs Storm Frequency = 25-yr Time to Peak = 12.92 hrs Time Interval = 1 min Hydrograph Volume = 9,422 cuft Inflow Hydrograph = 56 - PR-2B Max. Elevation = 554.56 ft Pond Name = PAPS-1 Max. Storage = 4,100 cuft Pond Routing by Storage Indication Method Center of mass detention time = 3.05 hrs Qp = 0.283 cfs 3 2 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 Time (hrs) PR-2B PR-2B Routing