Supporting Documentation · Jun 3, 2026
12 2026 02 12 Crestmont CC Stormwater Management Report
af4b3e068e3e8fd5e13ba0340f7139ca27c9c412a037f50ebc781a156e29509eIndexed text · page 983
Show all pages1017 Greeley Ave N Union, NJ 07083 908-964-0786 www.RSAGeolab.com Shelby Tube Hydraulic Conductivity Test ASTM D2434 (For Calculations) Client: Langan Eng. & Env. Services, Inc. Job No.: 869 Project: Eagle Rock Ave Widening Lab Log No.: L#25-4301 Proj. No. 101049802 Sample: TP-17A U-1 0.5'-1.25' Date: 7/18/2025 Average Length of Soil Core 4.089 in. Initial Weight of Soil Core 1007.2 grams Final Weight of Soil Core 1035.2 grams Dry Weight of Soil Core 889.9 grams Diameter of Shelby Tube 2.875 in. Initial Moisture Content 13.18% Diameter of Standpipe 0.250 in. Final Moisture Content 16.33% Wet Density, Initial 144.55 PCF Wet Density, Final 148.57 PCF Dry Density 127.72 PCF Initial Height Final Height Change in Water Time Interval Hydraulic Conductivity Trial No. (inches) (inches) Level (inches) (secs) cm/sec in/hr 1 40.1 39.6 0.5 300.0 3.28E-06 4.66E-03 2 39.6 39.0
cm/sec in/hr 1 40.1 39.6 0.5 300.0 3.28E-06 4.66E-03 2 39.6 39.0 0.6 310.0 3.87E-06 5.48E-03 3 39.8 39.3 0.5 300.0 3.31E-06 4.69E-03 Average Hydraulic Conductivity 3.49E-06 cm/sec 4.94E-03 in/hr Remarks: 1. Test Conducted Using Daired Tap Water at Standard Temp. (72° F) 2. 100% Saturation Assumed Tested by: SP Checked by: KP
File revisions (1)
- Sep 29, 2026
af4b3e068e3e295,851,182 bytes