13 2026 02 12 Crestmont CC Stormwater O and M Manual
83623f53962c553a5f6cf8536a89c4fc7594f22a7dab14b6b5ac921d34c5f391Indexed text · page 17
Show all pagesA B B A SECTION A-A SECTION B-B B DOWNSPOUT A A WYE FITTING 6" SCHEDULE 40 PVC WITH PVC BOOT ADAPTER DOWNSPOUT COVER PAINTED TO MATCH B 2" MAXIMUM SEE NOTE #1
#1 1% MINIMUM SLOPE SEE NOTE #2 45° BEND STORM SEWER PIPE (SIZE (SCH 40 PVC) VARIES) SEE GRADING PLAN FOR LOCATION INSTALL FLEXIBLE CONNECTION AFTER BEND
AFTER BEND NOTES: 1. FOR ALL DEPTHS OF COVER LESS THAN TWO (2) FEET, PIPE MUST BE SCHEDULE 40 PVC. FOR DEPTHS OF COVER GREATER THAN TWO (2) FEET, FLEXIBLE PIPE MAY BE USED. REFER TO SPECIFICATIONS FOR ALLOWABLE PIPE TYPES. 2. A WATERTIGHT CONNECTION SHALL BE MAINTAINED WITH ANY TRANSITION FROM SCHEDULE 40 PVC PIPE TO ANY OTHER PIPE TYPE. 3. THE DOWNSPOUT COLLECTOR DRAIN SHALL BE INSTALLED BEFORE THE
DOWNSPOUTS ARE INSTALLED ON THE BUILDING. SITEWORK CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK INCLUDING THE RODENT SCREEN. BUILDING CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONNECTION AT THE POINT OF THE RODENT SCREEN. 4. IF NECESSARY, ADJUST FOOTING TO ALLOW DOWNSPOUT TO BE INSTALLED TIGHT AGAINST BUILDING 12"(30cm) 4"(10cm) 1. Prepare soil before installing rolled erosion control 2/12/2026
2/12/2026 products (RECPs), including any necessary application 6" of lime, fertilizer, and seed. 6" (15cm) 4"(10cm) 2. Begin at the top of the channel by anchoring the (15cm) RECPs in a 6"(15cm) deep X 6"(15cm) wide trench with approximately 12"(30cm) of RECPs extended beyond 5 the up-slope portion of the trench. Use ShoreMax mat 2 7 at the channel/culvert outlet as supplemental scour 6" protection as
6" protection as needed. Anchor the RECPs with a row of (15cm) staples/stakes approximately 12"(30cm) apart in the 2"-5" bottom of the trench. Backfill and compact the trench (5-12.5cm) after stapling. Apply seed to the compacted soil and fold the remaining 12"(30cm) portion of RECPs back over the seed and compacted soil. Secure RECPs over compacted soil with a row of staples/stakes spaced 4"-6" (10-15cm) 3 approximately 12" apart across the width of the RECPs.
Langan Engineering and 3. Roll center RECPs in direction of water flow in bottom of channel. RECPs will unroll with appropriate side Environmental Services, LLC 6 against the soil surface. All RECPs must be securely fastened to soil surface by placing staples/stakes in appropriate locations as shown in the staple pattern 300 Kimball Drive 4
300 Kimball Drive 4 guide. 4. Place consecutive RECPs end-over-end (Shingle style) Parsippany, NJ 07054 with a 4"-6" overlap. Use a double row of staples staggered 4" apart and 4" on center to secure RECPs. 1 5. Full length edge of RECPs at top of side slopes must be anchored with a row of staples/stakes approximately T: 973.560.4900 F: 973.560.4901 www.langan.com 2"-5" 2"-5" (5-12.5cm) E (5-12.5cm) 12"(30cm) apart in a 6"(15cm) deep X 6"(15cm) wide
12"(30cm) apart in a 6"(15cm) deep X 6"(15cm) wide NJ Certificate of Authorization No. 24GA27996400 trench. Backfill and compact the trench after stapling. 6" 6. Adjacent RECPs must be overlapped approximately 2' 10" (15cm) 2"-5" (5-12.5cm) (Depending on RECPs type) and (0.6m) (25cm) stapled. 4' 7. In high flow channel applications a staple check slot is (1.2m) 8 recommended at 30 to 40 foot (9 -12m) intervals. Use a 20"(0.5m) double row of staples staggered 4"(10cm) apart and NOTES: 4"(10cm) on center over entire width of the channel. CRITICAL POINTS 10"(25cm)
4"(10cm) on center over entire width of the channel. CRITICAL POINTS 10"(25cm) *Horizontal staple spacing should be 8. The terminal end of the RECPs must be anchored with A. Overlaps and Seams B. Projected Water Line altered if necessary to allow staples to a row of staples/stakes approximately 12" (30cm) apart C. Channel Bottom/Side Slope Vertices secure the critical points along the in a 6"(15cm) deep X 6"(15cm) wide trench. Backfill 3.3' channel surface. and compact the trench after stapling. A A (1m) B B C C **In loose soil conditions, the use of staple or stake lengths greater than 6"(15cm) may be necessary to properly secure the RECP's. 3.75 Staples per SQ.YD.