Supporting Documentation · Jun 3, 2026
13 2026 02 12 Crestmont CC Stormwater O and M Manual
83623f53962c553a5f6cf8536a89c4fc7594f22a7dab14b6b5ac921d34c5f391Indexed text · page 4
Show all pages1.0 INTRODUCTION The New Jersey Administrative Code NJAC 7:8-5.8 entitled “Maintenance Requirements” sets forth rules and refers to the New Jersey Stormwater Best Practices Manual (the BMP manual) by the New Jersey Department of Environmental Protection (NJDEP). Chapter 8 of the BMP manual entitled “Maintenance and Retrofit of Stormwater Management Measures” specifically addresses the requirements for maintenance of a major development. Major development is defined in the aforementioned administrative code as any development that provides for ultimately disturbing one or more acres of land or increasing the amount of impervious surface by one-quarter of an acre. This report is prepared to address the maintenance component of the herein described development to ensure the effective, efficient, and enduring service of a particular stormwater measure. This plan contains preventative and corrective maintenance tasks and procedures. The party responsible for the preventative and corrective maintenance of the stormwater measures described herein is: Crestmont Country Club, Inc. 750 Eagle Rock Avenue West Orange, New Jersey 07052 Contact: Dana Cancellaro Phone: 973-731-2060 x256 Email: dana@crestmontcountryclub.com 2.0 PROJECT DESCRIPTION The project site is comprised of Block No.174, Lot No. 1.01 in the Township of West Orange, Essex County, New Jersey. The 146.76± acre tract is the location of Crestmont Country Club and predominantly covered by the grassed golf course, along with some wooded areas. The site is bound by Laurel Avenue and Eagle Rock Avenue to the north, undeveloped wooded area to the east and south, and a continuation of the Crestmont Country Club golf course to the west. The proposed work will only impact 3.93± acres of the site, located along Eagle Rock Avenue and Laurel Avenue in the north side of the property. The proposed development includes the construction of: • Installation of a new traffic signal at Eagle Rock Avenue & Oval Road intersection; • Widening along Eagle Rock Avenue to support the new lane geometry required at the new signal; 1
File revisions (1)
- Sep 29, 2026
83623f53962c12,665,776 bytes