Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 3, 2026

20 2026 01 21 Eagle Rock Ave and Oval Road Laurel Avenue Traffic Signal Design Report

Preserved file SHA-2562fd96061f763c297bef412dcd09909a5e693b90afd9f7782b6169b9eadec4966

Indexed text · page 50

Show all pages
Page 50

Lanes, Volumes, Timings 2027 Build (Unsignalized) 1: Laurel Avenue (CR 634) & Eagle Rock Avenue (CR 611) AM Peak Hour Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 294 435 492 408 282 283 Future Volume (vph) 294 435 492 408 282 283 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 120 0 0 Storage Lanes 0 1 1 1 Taper Length (ft) 50 25 Lane Util. Factor 0.95 0.95 1.00 0.95 1.00 1.00 Frt 0.910 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot) 3215 0 1752 3574 1770 1583 Flt Permitted 0.225 0.950 Satd. Flow (perm) 3215 0 415 3574 1770 1583 Right Turn on Red Yes Yes Satd. Flow (RTOR) 458 298 Link Speed (mph) 40 40 35 Link Distance (ft) 265 386 204 Travel Time (s) 4.5 6.6 4.0 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 1% 3% 3% 1% 2% 2% Adj. Flow (vph) 309 458 518 429 297 298 Shared Lane Traffic (%) Lane Group Flow (vph) 767 0 518 429 297 298 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft) 10 12 12 Link Offset(ft) 0 0 25 Crosswalk Width(ft) 35 10 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00

Page 50

0 25 Crosswalk Width(ft) 35 10 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 9 15 15 9 Number of Detectors 2 1 2 1 1 Detector Template Thru Left Thru Left Right Leading Detector (ft) 100 20 100 20 20 Trailing Detector (ft) 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 Detector 1 Size(ft) 6 20 6 20 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 Detector 2 Size(ft) 6 6 Detector 2 Type Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 Turn Type NA pm+pt NA Prot Prot Protected Phases 2 1 6 8 8 Scenario 1 2027 Build (Unsignalized) 11:52 am 01/21/2026 AM Peak Hour Synchro 12 Report Langan Page 1

File revisions (1)