Supporting Documentation · Jun 3, 2026
20 2026 01 21 Eagle Rock Ave and Oval Road Laurel Avenue Traffic Signal Design Report
2fd96061f763c297bef412dcd09909a5e693b90afd9f7782b6169b9eadec4966Indexed text · page 54
Show all pagesLanes, Volumes, Timings 2027 Build (Unsignalized) 1: Laurel Avenue (CR 634) & Eagle Rock Avenue (CR 611) PM Peak Hour Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 451 274 281 318 462 408 Future Volume (vph) 451 274 281 318 462 408 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 120 0 0 Storage Lanes 0 1 1 1 Taper Length (ft) 50 25 Lane Util. Factor 0.95 0.95 1.00 0.95 1.00 1.00 Frt 0.943 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot) 3391 0 1787 3574 1805 1615 Flt Permitted 0.193 0.950 Satd. Flow (perm) 3391 0 363 3574 1805 1615 Right Turn on Red Yes Yes Satd. Flow (RTOR) 166 439 Link Speed (mph) 40 40 35 Link Distance (ft) 265 386 204 Travel Time (s) 4.5 6.6 4.0 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 Heavy Vehicles (%) 0% 1% 1% 1% 0% 0% Adj. Flow (vph) 485 295 302 342 497 439 Shared Lane Traffic (%) Lane Group Flow (vph) 780 0 302 342 497 439 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft) 10 12 12 Link Offset(ft) 0 0 25 Crosswalk Width(ft) 35 10 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00
0 25 Crosswalk Width(ft) 35 10 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 9 15 15 9 Number of Detectors 2 1 2 1 1 Detector Template Thru Left Thru Left Right Leading Detector (ft) 100 20 100 20 20 Trailing Detector (ft) 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 Detector 1 Size(ft) 6 20 6 20 20 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 Detector 2 Size(ft) 6 6 Detector 2 Type Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 Turn Type NA pm+pt NA Prot Prot Protected Phases 2 1 6 8 8 Scenario 2 2027 Build (Unsignalized) 11:08 am 01/21/2026 PM Peak Hour Synchro 12 Report Langan Page 1
File revisions (1)
- Sep 29, 2026
2fd96061f7634,671,243 bytes