Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 3, 2026

20 2026 01 21 Eagle Rock Ave and Oval Road Laurel Avenue Traffic Signal Design Report

Preserved file SHA-2562fd96061f763c297bef412dcd09909a5e693b90afd9f7782b6169b9eadec4966

Indexed text · page 56

Show all pages
Page 56

Lanes, Volumes, Timings 2027 Build (Unsignalized) 1: Laurel Avenue (CR 634) & Eagle Rock Avenue (CR 611) PM Peak Hour Lane Group EBT EBR WBL WBT NBL NBR Reduced v/c Ratio 0.72 0.67 0.19 0.68 0.54 Intersection Summary Area Type: Other Cycle Length: 74 Actuated Cycle Length: 67.7 Natural Cycle: 60 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.85 Intersection Signal Delay (s/veh): 20.6 Intersection LOS: C Intersection Capacity Utilization 76.6% ICU Level of Service D Analysis Period (min) 15 90th %ile Actuated Cycle: 74 70th %ile Actuated Cycle: 74 50th %ile Actuated Cycle: 70.5 30th %ile Actuated Cycle: 63.7 10th %ile Actuated Cycle: 56.1 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1: Laurel Avenue (CR 634) & Eagle Rock Avenue (CR 611) Scenario 2 2027 Build (Unsignalized) 11:08 am 01/21/2026 PM Peak Hour Synchro 12 Report Langan Page 3

File revisions (1)