20 2026 01 21 Eagle Rock Ave and Oval Road Laurel Avenue Traffic Signal Design Report

Preserved file SHA-2562fd96061f763c297bef412dcd09909a5e693b90afd9f7782b6169b9eadec4966

Indexed text · page 67

Show all pages
Page 67

Lanes, Volumes, Timings 2027 Build (Signalized) 1: Laurel Avenue (CR 634) & Eagle Rock Avenue (CR 611) PM Peak Hour Lane Group EBT EBR WBL WBT NBL NBR Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.60 0.73 0.19 0.75 0.54 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:EBT and 6:WBTL, Start of Yellow, Master Intersection Natural Cycle: 70 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.85 Intersection Signal Delay (s/veh): 21.1 Intersection LOS: C Intersection Capacity Utilization 76.6% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1: Laurel Avenue (CR 634) & Eagle Rock Avenue (CR 611) Scenario 2 2027 Build (Signalized) 10:26 am 01/21/2026 PM Peak Hour Synchro 12 Report Langan Page 3

File revisions (1)