Supporting Documentation · Jun 3, 2026
2026 02 12 Crestmont CC and Eagle Rock Ave Stormwater Management Report
b2e79b7061cbbbe57e9837f2fec3a1c0d102ba104a1fd5bfe1ade5107afe3de3Indexed text · page 19
Show all pagesTable 16 – POA-1 Peak Discharge Summary – Future Storm Events POA-1 Design Storm Event Existing Peak Allowable Peak Proposed Peak Discharge (CFS) Discharge (CFS) Discharge (CFS) 2-Year 16.83 15.52 14.07 10-Year 29.21 27.85 24.77 100-Year 58.39 56.05 53.61 Table 17 – POA-2 Peak Discharge Summary – Current Storm Events POA-2 Design Storm Event Existing Peak Allowable Peak Proposed Peak Discharge (CFS) Discharge (CFS) Discharge (CFS) 2-Year 9.63 7.23 5.67 10-Year 17.05 14.95 10.31 100-Year 32.74 29.56 23.96 Table 18 – POA-2 Peak Discharge Summary – Future Storm Events POA-2 Design Storm Event Existing Peak Allowable Peak Proposed Peak Discharge (CFS) Discharge (CFS) Discharge (CFS) 2-Year 11.97 9.00 7.27 10-Year 21.02 18.44 14.02 100-Year 42.47 38.36 31.63 3.2 Stormwater Quality Design 3.2.1 Design Criteria The project site is subject to water quality treatment requirements as the redevelopment results in an increase in regulated motor vehicle surface coverage. In accordance with N.J.A.C. 7:8- 5.5.(a), major developments are subject to providing water quality treatment when the development results in an increase of one-quarter acre or more of regulated motor vehicle surface. The proposed redevelopment results in approximately 0.85± acres of new regulated motor vehicle surface within the limit of disturbance. Refer to Figure 8 – Required Water Quality Treatment Map for the total area of
edevelopment results in approximately 0.85± acres of new regulated motor vehicle surface within the limit of disturbance. Refer to Figure 8 – Required Water Quality Treatment Map for the total area of regulated motor vehicle surface that is subject to treatment 16
File revisions (1)
- Sep 29, 2026
b2e79b7061cb295,885,934 bytes