2026 02 12 Crestmont CC and Eagle Rock Ave Stormwater Management Report

Preserved file SHA-256b2e79b7061cbbbe57e9837f2fec3a1c0d102ba104a1fd5bfe1ade5107afe3de3

Indexed text · page 460

Show all pages
Page 460

Project: Eagle Rock Avenue By: TEG Date: 10/21/2025 Location: West Orange, NJ Checked By: MJV Date Checked: 10/21/2025 Circle One: Present Developed Current Proposed Watershed PR-2C-U Impervious Circle One: Tc Tt through subarea Include a map, schematic, or description of flow segments. Sheet Flow (Applicable to Tc Only) Segment ID 1 Smooth Surfaces 1. Surface Description (NEH table 15-1) 2. Manning's Roughness Coeff., n (NEH table 15-1) 0.011 3. Flow Length, L (total L < 100 ft) ft 89 4. Two-year 24-hr rainfall, P2 in 3.46 5. Land Slope, s ft/ft 0.089 6. Compute Tt 0.007 (nL)0.8 hr 0.010 + + Tt = P20.5s0.4 Sheet Flow Sub-Total 0.010 hours Shallow Concentrated Flow Segment ID 2 Pavement 7. Surface Description 8. Flow Length, L ft 29 9. Watercourse Slope, s ft/ft 0.010 10. Average Velocity, V (NEH table 15-3) ft/s 2.05 11. Compute Tt L hr 0.004 + + Tt = 3600 V

Page 460

+ Tt = 3600 V Shallow Conc. Flow Sub-Total 0.004 hours Channel Flow Segment ID 3 4 5 12. Flow Length, L ft 157 36 139 13. Cross Sectional flow area, a ft2 0.61 0.61 0.61 14. Wetted Perimeter, Pw ft 2.00 2.00 2.00 15. Hydraulic Radius, r r = a / Pw ft 0.31 0.31 0.31 16. Channel Slope, s ft/ft 0.028 0.080 0.040 17. Manning's Roughness Coeff., n 0.012 0.012 0.012 18. Velocity, V V = (1.49 r2/3 s1/2 ) / n ft/s 9.34 15.91 11.25 19. Compute Tt L hr 0.005 + 0.001 + 0.003 Tt = 3600 V Channel Flow Sub-Total 0.009 hours Channel Flow Segment ID 6 7 8 20. Flow Length, L ft 79 54 195 21. Cross Sectional flow area, a ft2 0.61 0.61 0.88 22. Wetted Perimeter, Pw

Page 460

ow area, a ft2 0.61 0.61 0.88 22. Wetted Perimeter, Pw ft 2.00 2.00 2.40 23. Hydraulic Radius, r r = a / Pw ft 0.31 0.31 0.37 24. Channel Slope, s ft/ft 0.020 0.015 0.013 25. Manning's Roughness Coeff., n 0.012 0.012 0.013 26. Velocity, V V = (1.49 r2/3 s1/2 ) / n ft/s 7.96 6.89 6.71 27. Compute Tt L hr 0.003 + 0.002 + 0.008 Tt = 3600 V Channel Flow Sub-Total 0.013 hours Watershed or subarea Tc or Tt Total Tc (hours) = 0.035 hours (Add Sub-Total Tt from prior steps) Total Tc (minutes) = 2 minutes \\langan.com\data\PAR\data8\101049801\Project Data\_Discipline\Site Civil\Stormwater\Time of Concentration Calcs\Proposed Tc Calcs\Current Proposed TCs\Current Proposed TC PR-2C-U Impervious v1.2