Supporting Documentation · Jun 3, 2026
2026 02 12 Crestmont CC and Eagle Rock Ave Stormwater Management Report
b2e79b7061cbbbe57e9837f2fec3a1c0d102ba104a1fd5bfe1ade5107afe3de3Indexed text · page 885
Show all pagesCRESTMONT COUNTRY CLUB EAGLE ROCK AVE IMPROVEMENTS LANGAN PROJECT #101049802 TOWNSHIP OF WEST ORANGE, NJ SMALL-SCALE BIORETENTION BASIN DESIGN SUMMARY TABLE CRESTMONT COUNTRY CLUB & EAGLE ROCK AVE IMPROVEMENTS LANGAN PROJECT #101049802 BOTTOM OF TOTAL SOIL MEDIA OCS FIRST DESIGN 100-YR EMERGENCY SURFACE INFLOW UNDERDRAIN BOTTOM OF TOP OF CONTRIBUTING DESIGN BIORETENTION BASIN ORIFICE WATER SURFACE SPILLWAY AREA OF DRAINAGE STONE BEDDING STORAGE EL. BERM EL. WATERSHED PERCOLATION OPENING EL. EL. CREST EL. BASIN (AC) AREA (AC) EL. (AC) RATE (IN/HR) SSBB-1 530.50 534.00 534.60 536.73 537.75 539.00 1.56 0.15 1.41 1.50 SSBB-2 533.50 537.00 537.40 539.63 540.67 542.00 2.26 0.35
1.41 1.50 SSBB-2 533.50 537.00 537.40 539.63 540.67 542.00 2.26 0.35 1.91 1.50 NOTES: \\langan.com\data\PAR\data8\101049801\Project Data\_Discipline\Site Civil\Stormwater\Eagle Rock Bioretention Basin Summary
File revisions (1)
- Sep 29, 2026
b2e79b7061cb295,885,934 bytes