Supporting Documentation · Jun 3, 2026
2026 02 12 Crestmont CC and Eagle Rock Ave Stormwater Management Report
b2e79b7061cbbbe57e9837f2fec3a1c0d102ba104a1fd5bfe1ade5107afe3de3Indexed text · page 899
Show all pagesLOG OF TEST PIT TP-1 Sheet 1 of 1 PROJECT NAME PROJECT NUMBER DATE Eagle Rock Ave Widening 101049801 4/25/2024 LOCATION ELEVATION West Orange, NJ Approx. el 538 (NAVD88) EXCAVATION CONTRACTOR DEPTH WATER LEVEL - First WATER LEVEL - Completion Semeraro Construction, Co., Inc. 4 ft - - EQUIPMENT FOREMAN LANGAN PERSONNEL
LANGAN PERSONNEL CAT 306 Excavator Mike Marie Vilsaint SAMPLE Depth Symbol ELEV Number DESCRIPTION REMARKS Type (feet) Scale
0 +538.0 Dark gray to black Silty f-c SAND, some roots (dry) [TOPSOIL] Started excavating on 4/25/2024. GRAB S-1 +537.0 1 Gray coarse GRAVEL (dry) [FILL] GRAB S-2 +536.0 2
+536.0 2 Brown Sandy SILT, some f-c gravel, trace roots, trace cobbles HSG taken from 24" to 36" bgs. \\LANGAN.COM\DATA\PAR\DATA8\101049801\PROJECT DATA\_DISCIPLINE\GEOTECHNICAL\GINTLOGS\101049801_TEST PITS.GPJ ... 8/25/2025 10:49:07 AM ... Report: Log - LANGANTP (moist) GRAB S-3 3 Refusal encountered at 2.5 to 4ft bgs (bucket +534.0 4 teeth scraping at bottom). End of Test Pit at 4ft
End of Test Pit at 4ft bgs. Top of bedrock was observed to slope East to West along Eagle Rock Ave from 2.5ft (east) to 4ft (west) bgs in 4ft span. 5 Completed excavating on 4/25/2024. Test pit backfilled with excavated material upon completion. 6 Easy digging observed from 0 to 4ft bgs.
No mottling nor groundwater seepage obeserved in the dug test pit. 7 8 9 10 11 12
13 14 15
File revisions (1)
- Sep 29, 2026
b2e79b7061cb295,885,934 bytes