Supporting Documentation · Jun 3, 2026
2026 02 12 Crestmont CC and Eagle Rock Ave Stormwater Management Report
b2e79b7061cbbbe57e9837f2fec3a1c0d102ba104a1fd5bfe1ade5107afe3de3Indexed text · page 961
Show all pages1017 Greeley Ave N Union, NJ 07083 908-964-0786 www.RSAGeolab.com Shelby Tybe Hydraulic Conductivity Test ASTM D2434 (For Calculations) Client: Langan Eng. & Env. Services, Inc. Job No.: 869 Project: Eagle Rock Ave Widening Project Lab Log No.: L#24-3391 Proj. No. 101049801 Sample: TP-6 S-1 1.5'-2.5' Date: 5/24/2024 Average Length of Soil Core 4.331 in. Initial Weight of Soil Core 890.4 grams Final Weight of Soil Core 893.3 grams Dry Weight of Soil Core 715.1 grams Diameter of Shelby Tube 2.875 in. Initial Moisture Content 24.51% Diameter of Standpipe 0.250 in. Final Moisture Content 24.93% Wet Density, Initial 120.64 PCF Wet Density, Final 121.04 PCF Dry Density 96.89 PCF Initial Height Final Height Change in Water Level Time Interval Hydraulic Conductivity Trial No. (inches) (inches) (inches) (secs) cm/sec in/hr 1 39.2
(inches) (secs) cm/sec in/hr 1 39.2 38.9 0.3 2140.0 2.99E-07 4.23E-04 2 38.9 38.6 0.3 2200.0 2.93E-07 4.15E-04 3 38.6 38.3 0.3 2220.0 2.92E-07 4.14E-04 Average Hydraulic Conductivity 2.95E-07 cm/sec 4.17E-04 in/hr Remarks: 1. Test Conducted Using Daired Tap Water at Standard Temp. (72° F) 2. 100% Saturation Assumed Tested by: AO Checked by: KP
File revisions (1)
- Sep 29, 2026
b2e79b7061cb295,885,934 bytes