POSSIBLE. IF NOT POSSIBLE, STOCKPILES ESTABLISHMENT OF PERMANENT VEGETATION. UP TO 50% REDUCTION IN APPLICATION WITH A DISC, SPRINGTOOTH HARROW, OR OTHER SUITABLE EQUIPMENT. THE FINAL RATE OF 1200 GALLONS/ACRE. 2/12/2026 SHALL BE COVERED WITH A MINIMUM OF 3 TO 6 INCHES OF WOOD CHIPS TO RATES MAY BE USED WHEN PERMANENT VEGETATION IS ESTABLISHED PRIOR TO 1. SITE PREPARATION HARROWING OR DISCING OPERATION SHOULD BE ON THE GENERAL CONTOUR. MINIMIZE EROSION OF THE STOCKPILE. SILT FENCE SHALL BE INSTALLED AT THE TOE REQUESTING A REPORT OF COMPLIANCE FROM THE DISTRICT. THESE RATES APPLY TO 4. TILLAGE CONTINUE TILLAGE UNTIL A REASONABLE UNIFORM SEEDBED IS PREPARED. OF THE SLOPE TO CONTAIN MOVEMENT OF THE STOCKPILED MATERIAL. TOPSOIL ALL METHODS OF SEEDING. ESTABLISHING PERMANENT VEGETATION MEANS 80%

Page 28

E STOCKPILED MATERIAL. TOPSOIL ALL METHODS OF SEEDING. ESTABLISHING PERMANENT VEGETATION MEANS 80% A. GRADE AT THE ONSET OF THE OPTIMAL SEEDING PERIOD SO AS TO MINIMIZE C. INSPECT SEEDBED JUST PRIOR TO SEEDING. IF TRAFFIC HAS LEFT THE SOIL COMPACTED, SHALL NOT BE APPLIED TO THE STOCKPILES TO PREVENT TOPSOIL CONTAMINATION VEGETATIVE COVER (OF THE SEEDED SPECIES) AND MOWED ONCE. NOTE THIS A. ROUGHEN THE SURFACE TO BRING CLODS TO THE SURFACE. THIS IS A TEMPORARY THE DURATION AND AREA OF EXPOSURE OF DISTURBED SOIL TO EROSION. THE AREA MUST BE RETILLED IN ACCORDANCE WITH THE ABOVE. WITH HIGH ACID PRODUCING SOIL. DESIGNATION OF MOWED ONCE DOES NOT GUARANTEE THE PERMANENCY OF THE TURF EMERGENCY MEASURE WHICH SHOULD BE USED BEFORE SOIL BLOWING BEGINS. IMMEDIATELY PROCEED TO ESTABLISH VEGETATIVE COVER IN ACCORDANCE SHOULD OTHER MAINTENANCE FACTORS BE NEGLECTED OR OTHERWISE MISMANAGED

Page 28

SHOULD OTHER MAINTENANCE FACTORS BE NEGLECTED OR OTHERWISE MISMANAGED BEGIN PLOWING ON THE WINDWARD SIDE OF THE SITE. USE CHISEL-TYPE PLOWS WITH THE SPECIFIED SEED MIXTURE. 3. SEEDING 5. HIGH ACID-PRODUCING SOILS WITH A pH OF 4 OR LESS, OR CONTAINING IRON SPACED APPROXIMATELY 12" APART, OR SPRING-TOOTHED HARROWS. B. GRADE AS NEEDED AND FEASIBLE TO PERMIT THE USE OF CONVENTIONAL SULFIDE, (INCLUDING BORROW FROM CUTS OR DREDGED SEDIMENT) SHALL BE A. TEMPORARY SEED MIX: PERENNIAL RYEGRASS - 100 LBS/ACRE. OPTIMAL PLANTING EQUIPMENT FOR SEEDBED PREPARATION, SEEDING MULCH APPLICATION AND ULTIMATELY PLACED OR BURIED WITH LIMESTONE APPLIED AT THE RATE OF 10 TONS DATES BETWEEN MARCH 1 AND MAY 15 OR BETWEEN AUGUST 15 AND OCTOBER 1. 5. SPRINKLING ANCHORING, AND MAINTENANCE. PER ACRE (OR 450 LBS / 1,000 SF OF SURFACE AREA) AND COVERED WITH A MINIMUM B. CONVENTIONAL SEEDING IS

Page 28

50 LBS / 1,000 SF OF SURFACE AREA) AND COVERED WITH A MINIMUM B. CONVENTIONAL SEEDING IS PERFORMED BY APPLYING SEED UNIFORMLY BY HAND, C. AS GUIDEANCE FOR IDEAL CONDITIONS, SUBSOIL SHOULD BE TESTED FOR OF 12 INCHES OF SETTLED SOIL WITH A pH OF 5 OR MORE EXCEPT AS FOLLOWS: CYCLONE (CENTRIFUGAL) SEEDER, DROP SEEDER, DRILL OR CULTIPACKER SEEDER. A. SPRINKLE ALL EXPOSED AREAS UNTIL THE SURFACE IS WET. LIME REQUIREMENT. LIMESTONE, IF NEEDED, SHOULD BE APPLIED TO BRING Langan Engineering and EXCEPT FOR DRILLED, HYDROSEEDED OR CULTIPACKED SEEDINGS, SEED SHALL BE SOIL TO A PH OF APPROXIMATELY 6.5 AND INOCRPORATED INTO THE SOIL AS Environmental Services, LLC A. AREAS WHERE TREES OR SHRUBS ARE TO BE PLANTED SHALL BE COVERED WITH MAINTENANCE NOTES INCORPORATED INTO THE SOIL WITHIN 24 HOURS OF SEEDBED PREPARATION TO A 6. BARRIERS NEARLY AS PRACTICAL TO A DEPTH OF 4". A MINIMUM OF 24 INCHES OF SOIL WITH A pH OF 5 OR MORE.

Page 28

H OF 4". A MINIMUM OF 24 INCHES OF SOIL WITH A pH OF 5 OR MORE. DEPTH OF 1/4 TO 1/2 INCH, BY RAKING OR DRAGGING. DEPTH OF SEED PLACEMENT MAY D. PRIOR TO TOPSOILING, THE SUBSOIL SHALL BE IN COMPLIANCE WITH THE 1. MAINTENANCE IS NECESSARY TO ALLOW FOR CONTINUING PERFORMANCE OF A. SOLID BOARD FENCE, SNOW FENCES, BURLAP FENCES, CRATE WALLS, BALES OF STANDARD FOR LAND GRADING. 300 Kimball Drive BE 1/4 INCH DEEPER ON COARSE-TEXTURED SOIL. B. DISPOSAL AREAS SHALL NOT BE LOCATED WITHIN 24 INCHES OF ANY SURFACE EROSION CONTROL DEVICES DURING THE CONSTRUCTION PERIOD AND LONG TERM HAY AND SIMILAR MATERIALS USED TO CONTROL AIR CURRENTS AND SOIL E. EMPLOY NEEDED EROSION CONTROL MEASURES AS

Page 28

HAY AND SIMILAR MATERIALS USED TO CONTROL AIR CURRENTS AND SOIL E. EMPLOY NEEDED EROSION CONTROL MEASURES AS INDICATED ON THE "SOIL Parsippany, NJ 07054 C. AFTER SEEDING, FIRM THE SOIL WITH A CORRUGATED ROLLER TO ASSURE GOOD OF A SLOPE OR BANK, SUCH AS BERMS, STREAM BANKS, DITCHES AND OTHERS MAINTENANCE, FOLLOWING COMPLETION OF CONSTRUCTION, FOR THE LIFE OF BLOWING. EROSION AND SEDIMENT CONTROL PLANS. SEED-TO-SOIL CONTACT, RESTORE CAPILLARITY, AND IMPROVE SEEDLING EMERGENCE. TO PREVENT POTENTIAL LATERAL LEACHING DAMAGES. STRUCTURAL MEASURES. ALL STRUCTURAL MEASURES FOR CONTROL OF SOIL D. HYDROSEEDING IS A BROADCAST SEEDING METHOD USUALLY INVOLVING A TRUCK, OR EROSION AND SEDIMENTATION MUST HAVE TIMELY MAINTENANCE. PARTICULAR 7. CALCIUM CHLORIDE 4. APPLYING TOPSOIL

Page 28

4. APPLYING TOPSOIL T: 973.560.4900 F: 973.560.4901 www.langan.com TRAILER-MOUNTED TANK, WITH AN AGITATION SYSTEM AND HYDRAULIC PUMP FOR 6. EQUIPMENT USED FOR MOVEMENT OF HIGH ACID-PRODUCING SOILS SHOULD BE ATTENTION SHOULD BE GIVEN TO TEMPORARY STRUCTURES SUCH AS SEDIMENT NJ Certificate of Authorization No. 24GA27996400 MIXING SEED, WATER AND FERTILIZER AND SPRAYING THE MIX ONTO THE PREPARED CLEANED AT THE END OF EACH DAY TO PREVENT SPREADING OF HIGH BARRIERS AND CONSTRUCTION APRONS. A. LOOSE, DRY GRANULES OR FLAKES SHALL BE FED THROUGH COMMONLY USED A. TOPSOIL SHOULD BE HANDLED ONLY WHEN IT IS DRY ENOUGH TO WORK

Page 28

A. LOOSE, DRY GRANULES OR FLAKES SHALL BE FED THROUGH COMMONLY USED A. TOPSOIL SHOULD BE HANDLED ONLY WHEN IT IS DRY ENOUGH TO WORK SEEDBED. MULCH SHALL NOT BE INCLUDED IN THE TANK WITH SEED. SHORTFIBERED ACID-PRODUCING SOIL MATERIALS TO OTHER PARTS OF THE SITE, INTO STREAMS OR SPREADERS AT A RATE THAT WILL KEEP THE SURFACE MOIST BUT NOT CAUSE WITHOUT DAMAGING SOIL STRUCTURE. MULCH MAY BE APPLIED WITH A HYDROSEEDER FOLLOWING SEEDING. (ALSO SEE STORMWATER CONVEYANCES AND TO PROTECT MACHINERY FROM ACCELERATED POLLUTION OR PLANT DAMAGE. IF USED ON STEEP SLOPES, OTHER PRACTICES B. A UNIFORM APPLICATION TO AN AVERAGE DEPTH OF 5", MINIMUM OF 4", SECTION 4-MULCHING BELOW). RUSTING. MUST ALSO BE IMPLEMENTED TO PREVENT WASHING

Page 28

MUST ALSO BE IMPLEMENTED TO PREVENT WASHING INTO STREAMS OR FIRMED IN PLACE IS REQUIRED. SOILS WITH A PH OF 4.0 OR LESS OR ACCUMULATION AROUND PLANTS. CONTAINING IRON SULFIDE SHALL BE COVERED WITH A MINIMUM DEPTH OF 4. MULCHING 7. NON-VEGETATIVE EROSION CONTROL PRACTICES (STONE TRACKING PADS, MULCHING IS REQUIRED ON ALL SEEDING TO INSURE AGAINST EROSION BEFORE GRASS IS 12" OF SOIL HAVING A PH OF 5.0 OR MORE. STRATEGICALLY PLACED LIMESTONE CHECK DAM, SILT FENCE, WOOD CHIPS) SHOULD ADDITIONAL NOTES 8. STONE ESTABLISHED AND PROMOTE FASTER AND EARLIER ESTABLISHMENT.

Page 28

ESTABLISHED AND PROMOTE FASTER AND EARLIER ESTABLISHMENT. C. PURSUANT TO THE REQUIREMENTS IN SECTION 7 OF THE STANDARD FOR BE INSTALLED TO LIMIT THE MOVEMENT OF HIGH ACID PRODUCING SOILS FROM, PERMANENT VEGETATIVE STABILIZATION, THE CONTRACTOR IS RESPONSIBLE 1. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL PERMANENT SOIL EROSION A. COVER SURFACE WITH CRUSHED STONE OR COARSE GRAVEL. AROUND OR OFF THE SITE. A. UNROTTED SMALL GRAIN STRAW, HAY FREE OF SEEDS, OR SALT HAY SHALL BE APPLIED TO ENSURE THAT PERMANENT VEGETATIVE COVER BECOMES ESTABLISHED ON AND SEDIMENT CONTROL MEASURES DURING CONSTRUCTION. THE PROPERTY OWNERS SHALL ASSUME THIS RESPONSIBILITY AFTER CONSTRUCTION IS COMPLETED AND AT A RATE OF 70 TO 90 LBS/1,000 SF (1-1/2 TO 2 TONS PER ACRE). MULCH