LCH MATERIALS SHALL BE UN-ROTTED SMALL GRAIN STRAW APPLIED AT THE RATE INTO THE SURFACE 4 INCHES. IF FERTILIZER IS NOT INCORPORATED, APPLY ONE-HALF ACCORDING TO THE MANUFACTURER’S REQUIREMENTS) MAY BE APPLIED BY A TO MASS GRADING ACTIVITIES. (DURATION - 10 DAYS) INPUTS. OF 70 TO 90 POUNDS PER 1,000 SQUARE FEET AND ANCHORED WITH A MULCH THE RATE DESCRIBED ABOVE DURING SEEDBED PREPARATION AND REPEAT ANOTHER HYDROSEEDER. 2. MEADOW SEED MIX B (FOR USE ON INTERIOR SIDE SLOPES OF ALL STORMWATER BASINS) ANCHORING TOOL, LIQUID MULCH BINDERS, OR NETTING TIE DOWN. OTHER SUITABLE ONE-HALF THE RATE APPLICATION OF THE SAME FERTILIZER WITHIN 3 TO 5 WEEKS AFTER D. MULCH NETTING, SUCH AS PAPER JUTE, EXCELSIOR, COTTON, OR PLASTIC, MAY BE USED. 6. BEGIN DEMOLITION OF EXISTING PAVEMENT, SITE FEATURES, UTILITY INFRASTRUCTURE, ETC. 3. FERTILIZER AND LIME SHOULD BE APPLIED AS NEEDED TO MAINTAIN A DENSE MATERIALS MAY BE USED IF APPROVED BY THE SOIL CONSERVATION DISTRICT. SEEDING. E. WOODCHIPS APPLIED UNIFORMLY TO A MINIMUM DEPTH OF 2 INCHES MAY BE USED. - NEW ENGLAND WILDFLOWER MIX (AS SUPPLIED BY NEW ENGLAND WETLAND PLANTS INC; PHONE: AS SPECIFIED ON THE DEMOLITION PLANS. EXISTING PAVEMENT MATERIAL IS TO BE CRUSHED STAND OF DESIRABLE SPECIES. FREQUENTLY MOWED AREAS AND THOSE ON B. WORK LIME AND FERTILIZER INTO THE SOIL AS NEARLY AS PRACTICAL TO A DEPTH OF 4" WOODCHIPS WILL NOT BE USED ON AREAS WHERE FLOWING WATER COULD WASH 413-548-8000) AND STOCKPILED FOR RE-USE AS FILL MATERIAL WHERE SUITABLE. AS GRADING OPERATIONS SANDY SOILS WILL REQUIRE MORE FREQUENT
AND STOCKPILED FOR RE-USE AS FILL MATERIAL WHERE SUITABLE. AS GRADING OPERATIONS SANDY SOILS WILL REQUIRE MORE FREQUENT FERTILIZATION BUT AT LOWER 7. ALL EROSION CONTROL DEVICES SHALL BE PERIODICALLY INSPECTED, MAINTAINED WITH A DISC, SPRING-TOOTH HARROW, OR OTHER SUITABLE EQUIPMENT. THE FINAL THEM INTO AN INLET AND PLUG IT. COMMENCE, EXCAVATED SOIL IS TO BE STOCKPILED AND TEMPORARILY STABILIZED IN NUTRIENT RATES PER APPLICATION. AND CORRECTED BY THE CONTRACTOR. ANY DAMAGE INCURRED BY EROSION SHALL HARROWING OR DISKING OPERATION SHOULD BE ON THE GENERAL CONTOUR. F. GRAVEL, CRUSHED STONE, OR SLAG AT THE RATE OF 9 CUBIC YARDS PER 1,000 SQ. FT. LITTLE BLUESTEM (SCHIZACHYRIUM SCOPARIUM), ACCORDANCE WITH THE SPECIFICATIONS AND CONSTRUCTION DETAIL. (DURATION - 15 DAYS) BE RECTIFIED IMMEDIATELY. CONTINUE TILLAGE UNTIL A REASONABLE UNIFORM SEEDBED IS PREPARED. APPLIED UNIFORMLY TO A MINIMUM DEPTH OF 3 INCHES MAY BE USED. SIZE 2 OR 3 RED FESCUE (FESTUCA RUBRA), 4. LIME REQUIREMENT SHALL BE DETERMINED BY SOIL TESTING EVERY 2 TO 3 YEARS. C. HIGH ACID-PRODUCING SOIL - SOILS HAVING A pH OF 4 OR LESS OR CONTAINING IRON (ASTM C-33) IS RECOMMENDED. INDIAN GRASS (SORGHASTRUM NUTANS), 7. CONSTRUCT STORM DRAINAGE SYSTEM AND STORMWATER MANAGEMENT BASINS FERTILIZATION INCREASES THE NEED FOR LIMING. 8. THE HUDSON-ESSEX-PASSAIC SOIL CONSERVATION DISTRICT WILL BE NOTIFIED IN SULFIDE SHALL BE COVERED WITH MINIMUM OF 12 INCHES OF SOIL
ATION INCREASES THE NEED FOR LIMING. 8. THE HUDSON-ESSEX-PASSAIC SOIL CONSERVATION DISTRICT WILL BE NOTIFIED IN SULFIDE SHALL BE COVERED WITH MINIMUM OF 12 INCHES OF SOIL HAVING A pH OF 5 PARTRIDGE PEA (CHAMAECRISTA FASCICULATA), CONCURRENTLY WITH GRADING OPERATIONS TO MINIMIZE CUTS. AS CATCH BASINS ARE WRITING AT LEAST 72 HOURS PRIOR TO ANY SOIL DISTURBING ACTIVITIES. FAX - (862) OR MORE BEFORE INITIATING SEEDBED PREPARATION. SEE STANDARD FOR 3. MULCH ANCHORING CANADA WILD RYE (ELYMUS CANADENSIS), 5. FERTILIZATION AND ADDITIONS OF OTHER SOIL AMENDMENTS ARE NOT CONSTRUCTED, PLACE INLET PROTECTION OVER GRATES AND MAINTAIN AS INDICATED ON THE 333-4507 OR EMAIL - INFORMATION@HEPSCD.ORG. MANAGEMENT OF HIGH ACID-PRODUCING SOIL. VIRGINIA WILD RYE (ELYMUS VIRGINICUS), RECOMMENDED FOR MANAGING NATIVE VEGETATION SUCH AS IN THE PINELANDS PLAN AND DETAILS.
PLAN AND DETAILS. (DURATION - 45 DAYS) MULCH ANCHORING - SHOULD BE ACCOMPLISHED IMMEDIATELY AFTER PLACEMENT OF HAY OR BLUE VERVAIN (VERBENA HASTATA), NATIONAL RESERVE. SEE THE STANDARD FOR PERMANENT VEGETATIVE 9. THE APPLICANT MUST OBTAIN A DISTRICT ISSUED REPORT-OF-COMPLIANCE PRIOR TO STRAW MULCH TO MINIMIZE LOSS BY WIND OR WATER. THIS MAY BE DONE BY ONE OF THE BUTTERFLY MILKWEED (ASCLEPIAS TUBEROSA), STABILIZATION FOR SPECIFIC REQUIREMENTS IN THE PNR. 3. SEEDING 8. CONSTRUCT UNDERGROUND UTILITIES, CONCURRENTLY WITH GRADING OPERATIONS TO FOLLOWING METHODS, DEPENDING UPON THE SIZE OF THE AREA AND STEEPNESS OF SLOPES. NARROWLEAFED BLUE EYED GRASS (SISYRINCHIUM ANGUSTIFOLIUM), APPLYING FOR THE CERTIFICATE OF OCCUPANCY OR TEMPORARY CERTIFICATE OF A. PERMANENT SEEDING SHALL BE IN ACCORDANCE WITH "STANDARDS FOR SOIL EROSION
ANCE WITH "STANDARDS FOR SOIL EROSION MINIMIZE CUTS. ON-SITE UTILITIES SHALL CONSIST OF GAS, ELECTRIC, TELEPHONE, CABLE, BLACK EYED SUSAN (RUDBECKIA HIRTA), OCCUPANCY FROM THE RESPECTIVE MUNICIPALITY, NJ - DCA OR ANY OTHER AND SEDIMENT CONTROL IN NEW JERSEY." THE FOLLOWING SEEDING SCHEDULE WATER AND SANITARY SEWER. ADVANCE TRENCH EXCAVATION SHALL BE LIMITED TO THE 6. WEED INVASION MAY RESULT FROM ABUSIVE MOWING AND FROM INADEQUATE NEW ENGLAND ASTER (SYMPHYOTRICHUM NOVAE-ANGLIAE), CONTROLLING AGENCY. CONTACT THE DISTRICT AT 862-333-4505 TO REQUEST A SHOULD BE USED FOR PERMANENT SEEDING (UNLESS OTHERWISE NOTED, REFER TO A. PEG AND TWINE - DRIVE 8 TO 10 INCH WOODEN PEGS TO WITHIN 2 TO 3 INCHES OF THE LENGTH OF PIPE WHICH CAN BE COMPLETED IN THE SAME DAY. IF NO FURTHER GRADING IS FERTILIZING AND LIMING. MANY NEWLY ESTABLISHED GRASSES WILL NOT SURVIVE SPIKED GAYFEATHER/ MARSH BLAZING STAR (LIATRIS SPICATA),
SPIKED GAYFEATHER/ MARSH BLAZING STAR (LIATRIS SPICATA), FINAL INSPECTION, GIVING ADVANCED NOTICE UPON COMPLETION OF THE STORMWATER BASIN PERMANENT SEEDING NOTES): SOIL SURFACE EVERY 4 FEET IN ALL DIRECTIONS. STAKES MAY BE DRIVEN BEFORE OR STARVED/CALICO ASTER (ASTER LATERIFLORUS/SYMPHYOTRICHUM LATERIFLORUM), REQUIRED IN THE AREA OF THE COMPLETED UTILITY TRENCH THEN THE TRENCH SHALL BE IF MOWED AT HEIGHTS BELOW 2.5 INCHES AND AT INTERVALS GREATER THAN 7 RESTABILIZATION MEASURES. A PERFORMANCE DEPOSIT MAY BE POSTED WITH THE AFTER APPLYING MULCH. SECURE MULCH TO SOIL SURFACE BY STRETCHING TWINE EARLY GOLDENROD (SOLIDAGO JUNCEA), GRADED TO FINISH SUB-GRADE ELEVATION AS SHOWN ON THE PLAN AND IMMEDIATELY DAYS. BRUSH INVASION IS A COMMON CONSEQUENCE OF LACK OF MOWING. THE DISTRICT WHEN WINTER WEATHER OR SNOW COVER PROHIBITS THE PROPER 1. APPLY TOPSOIL TO A MINIMUM DEPTH OF 5 INCHES. BETWEEN PEGS IN A CRISS-CROSS AND A SQUARE PATTERN. SECURE TWINE AROUND HOLLOW-STEM JOE PYE WEED (EUPATORIUM FISTULOSUM/EUTROCHIUM FISTULOSUM) THEREAFTER STABILIZED. (DURATION - 10 DAYS) AMOUNT OF WEEDS OR BRUSH THAT CAN BE TOLERATED IN ANY VEGETATED AREA APPLICATION OF SEED, MULCH, FERTILIZER OR HYDRO-SEED. 2. FERTILIZER - 14 LBS/1,000 SF; 10-20-10 OR EQUIVALENT, WITH 50% WATER INSOLUBLE EACH PEG WITH TWO OR MORE ROUND TURNS. DEPENDS UPON THE INTENDED USE OF THE LAND. DRAINAGE WAYS ARE SUBJECT
DEPENDS UPON THE INTENDED USE OF THE LAND. DRAINAGE WAYS ARE SUBJECT NITROGEN, WORKED INTO SOIL TO A DEPTH OF 4 INCHES. B. MULCH NETTINGS - STAPLE PAPER, COTTON, OR PLASTIC NETTINGS OVER MULCH. USE NOTES: 9. CONSTRUCT CONCRETE CURB, PARKING AREAS, DRIVEWAYS AND ACCESS WAYS AND PLACE TO RAPID INFESTATION BY WEED AND WOODY PLANTS. THESE SHOULD BE 10. PAVED ROADWAYS MUST BE KEPT CLEAN AT ALL TIMES. DO NOT UTILIZE A FIRE OR 3. SEED MIX TO BE APPLIED AT 220 LBS/ACRE: DEGRADABLE NETTING IN AREAS TO BE MOWED. NETTING IS USUALLY AVAILABLE IN 1. SEED AT A RATE OF 20-40 LBS./ACRE OF 100% PURE LIVE SEED. GRAVEL SUB-BASE AND BITUMINOUS BAS COURSE. (DURATION - 30 DAYS) CONTROLLED, SINCE THEY OFTEN REDUCE DRAINAGE WAY EFFICIENCY. CONTROL GARDEN HOSE TO CLEAN ROADS UNLESS THE RUNOFF IS DIRECTED TO A PROPERLY 3.1. 10% DEEPBLUE KENTUCKY BLUEGRASS ROLLS 4 FEET WIDE AND UP TO 300 FEET LONG. 2. FOR SPRING SEEDING, APPLY A NURSE CROP OF OATS AT A RATE OF 30 LBS./ACRE. OF WEEDS OR BRUSH IS ACCOMPLISHED BY USING HERBICIDES OR MECHANICAL DESIGNED AND FUNCTIONING SEDIMENT BASIN. WATER PUMPED OUT OF THE 3.2. 25% DAKOTA TALL FESCUE C. CRIMPER MULCH ANCHORING COULTER TOOL - A TRACTOR-DRAWN IMPLEMENT 3. FOR FALL SEEDING, APPLY A NURSE CROP OF WINTER RYE AT A RATE OF 30 LBS./ACRE. 10.PRIOR TO THE PLACEMENT OF TOPSOIL, CONDUCT SOIL COMPACTION TESTING AND METHODS. EXCAVATED AREAS CONTAINS SEDIMENTS THAT MUST BE REMOVED PRIOR TO 3.3. 25% TAOS TALL FESCUE
EXCAVATED AREAS CONTAINS SEDIMENTS THAT MUST BE REMOVED PRIOR TO 3.3. 25% TAOS TALL FESCUE ESPECIALLY DESIGNED TO PUNCH AND ANCHOR MULCH INTO THE SOIL SURFACE. THIS REMEDIATE SUBSOIL (SCARIFICATION/TILLAGE TO A MINIMUM DEPTH OF 6") AS NECESSARY. DISCHARGING TO RECEIVING BODIES OF WATER USING REMOVABLE PUMPING 3.4. 40% FRONTIER PERENNIAL RYEGRASS PRACTICE AFFORDS MAXIMUM EROSION CONTROL, BUT ITS USE IS LIMITED TO THOSE (DURATION - 5 DAYS) 7. ACCUMULATED DRY VEGETATION SHALL BE REMOVED TO REDUCE THE FIRE STATIONS, SUMP PITS, PORTABLE SEDIMENTATION TANKS AND/OR SILT CONTROL 4. SEEDING DATES FOR THIS MIXTURE SHALL BE BETWEEN MARCH 1ST AND APRIL 30TH SLOPES UPON WHICH THE TRACTOR CAN OPERATE SAFELY. SOIL PENETRATION SHOULD HAZARD. BAGS. OR BETWEEN AUGUST 15TH AND OCTOBER 15TH. BE ABOUT 3 TO 4 INCHES. ON SLOPING LAND, THE OPERATION SHOULD BE ON THE 11. COMPLETE FINAL SITE GRADING AND LANDSCAPE OF ALL APPROPRIATE AREAS AS INDICATED CONTOUR. ON THE LANDSCAPE PLAN. STABILIZE WITH PERMANENT SEEDING. (DURATION - 20 DAYS) 8. PRUNE TREES AND
ON THE LANDSCAPE PLAN. STABILIZE WITH PERMANENT SEEDING. (DURATION - 20 DAYS) 8. PRUNE TREES AND SHRUBS TO REMOVE DEAD OR DAMAGED BRANCHES. REMOVE 11. ALL SURFACES HAVING LAWN OR LANDSCAPING AS FINAL COVER ARE TO BE B. CONVENTIONAL SEEDING IS PERFORMED BY APPLYING SEED UNIFORMLY BY HAND, D. LIQUID MULCH-BINDERS UNDESIRABLE OR INVASIVE PLANTS TO MAINTAIN INTEGRITY OF THE LANDSCAPE PROVIDED TOPSOIL PRIOR TO RE-SEEDING, SODDING OR PLANTING. A DEPTH OF 5.0 CYCLONE (CENTRIFUGAL) SEEDER, DROP SEEDER, DRILL OR CULTIPACKER SEEDER. 1. APPLICATIONS SHOULD BE HEAVIER AT EDGES WHERE WIND CATCHES THE 12. CONTRACTOR TO JET CLEAN ALL SITE DRAINAGE STRUCTURES AND PIPES OF ANY SILT OR AND ENHANCE QUALITY OF PERMANENT VEGETATIVE COVER. INCHES, FIRMED IN PLACE, IS REQUIRED, AS PER THE STANDARDS FOR TOPSOILING EXCEPT FOR DRILLED, HYDROSEEDED OR CULTIPACKED SEEDINGS, SEED SHALL BE MULCH, IN VALLEYS, AND AT CRESTS OF BANKS. REMAINDER OF AREA DEBRIS RESULTING FROM SITE CONSTRUCTION PRIOR TO FINAL TURNOVER. (DURATION - 3 AND LAND GRADING, EFFECTIVE DECEMBER 2017. INCORPORATED INTO THE SOIL WITHIN 24 HOURS OF SEEDBED PREPARATION TO A SHOULD BE UNIFORM IN APPEARANCE. DAYS) DEPTH OF 1/4 TO 1/2 INCH, BY RAKING OR DRAGGING. DEPTH OF SEED PLACEMENT MAY 2. USE ONE OF THE FOLLOWING: 12. ALL PLAN
DEPTH OF 1/4 TO 1/2 INCH, BY RAKING OR DRAGGING. DEPTH OF SEED PLACEMENT MAY 2. USE ONE OF THE FOLLOWING: 12. ALL PLAN REVISIONS MUST BE SUBMITTED TO THE DISTRICT FOR PROPER REVIEW BE 1/4 INCH DEEPER ON COARSE-TEXTURED SOIL. A. ORGANIC AND VEGETABLE BASED BINDERS - NATURALLY 13.NOTIFY THE HUDSON ESSEX PASSAIC SOIL CONSERVATION DISTRICT AT COMPLETION OF AND APPROVAL. C. AFTER SEEDING, FIRM THE SOIL WITH A CORRUGATED ROLLER TO ASSURE GOOD OCCURRING, POWDER BASED, HYDROPHILIC MATERIALS THAT CONSTRUCTION (DURATION - 1 DAY) SEED-TO-SOIL CONTACT, RESTORE CAPILLARITY, AND IMPROVE SEEDLING EMERGENCE. MIXED WITH WATER FORMULATES A GEL AND WHEN APPLIED TO STANDARD FOR TOPSOILING 13. A CRUSHED STONE WHEEL CLEANING TRACKING-PAD IS TO BE INSTALLED AT ALL SITE D. HYDROSEEDING IS A BROADCAST SEEDING METHOD USUALLY INVOLVING A TRUCK, OR MULCH UNDER SATISFACTORY CURING CONDITIONS WILL FORM 14. CONSTRUCTION ENTRANCE, SILT FENCE, FILTER SOCK, INLET PROTECTION, AND ALL OTHER EXITS USING 2 ½ -1” CRUSHED ANGULAR STONE (ASTM 2 OR 3) TO A MINIMUM TRAILER-MOUNTED TANK, WITH AN